My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
17-18835
Zephyrhills
>
Building Department
>
Permits
>
2017
>
17-18835
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2018 11:17:46 AM
Creation date
7/30/2018 11:17:44 AM
Metadata
Fields
Template:
Building Department
Company Name
PAKHILL
Building Department - Doc Type
Permit
Permit #
17-18835
Building Department - Name
MASHBURN,MONTGOMERY L
Address
38831 NORTH AVE
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, , ' � ' ��,.,,_'�,f.�..� <br /> � ��``°-�_ <br /> - ��4-� �TR.I�,II`fY�E�D <br /> � <br /> 6.3 Re-fasten any loose decking panels, and check for protruding nail heads. Sweep the substrate thoroughly to remove <br /> any dust and debris prior to application. <br /> 6.4 RhinoRoof U20: <br /> 6.4.1 Fasteners: <br /> For exposure < 24 hours, corrosion resistant fasteners may be 1-inch roofing nails with a 3/8-inch diameter head, or <br />, those noted in 6.4.2. The use of staples is prohibited. <br />' For exposure > 24 hours up to maximum 30 days, corrosion resistant fasteners shall be minimum 1-inch diameter <br /> plastic or metal cap nails or FBC HVHZ nails & 1-5/8" diameter tin caps (with the rough edge facing up). The use of <br /> staples is prohibited. <br /> 6 4.2 Sin�le Laver;Roof Slope>4.12: <br /> End(vertical) laps shall be minimum 6-inches and side(horizontal) laps shall be minimum 4-inches. Refer to Interwrap, <br /> Inc.recommendations for alternate lap configurations and/or the use of sealant under certain conditions. <br />' For exposure<24 hours, use of every-other fastening location printed on the surface is acceptable. For exposure>24 <br /> hours up to maximum 30-days,use of every fastening location printed on the surface is required. <br /> When batten systems are to be installed atop the underlayment,the underlayment need only be preliminarily attached <br /> pending attachment of the battens on the same day. Battens shall not be positioned over cap nails. If this occurs, <br /> remove the cap nail and patch the hole in accordance with Interwrap published instructions. <br /> 6.4.3 Doubte Layer;2:12<Roof Slope<4:12: <br /> End(vertical}laps shall be minimum 12-inches and side(horizontal)laps shall be minimum half-sheet-width plus 1-inch. <br /> Double layer application; begin by fastening a half-width plus 1-inch starter strip along the eaves. Place a full-width <br />' sheet over the starter, completely overlapping the starter course. Continue as noted in 6.5, but maintaining minimum <br /> half-width plus 1-inch side(horizontal)laps,resulting in a double-layer application. � <br /> 7. EiUILDING PERMIT REQUIREMENTS: <br /> As required by the Building Official or Authority Having Jurisdiction in order to properly evaluate the installation of this product. <br /> 8. MANUFACTURING PLANTS: <br /> Contact the manufacturer or the named QA entity for information on plants covered under Rule 61G20-3 QA requirements. <br /> 9. QUALITY ASSURANCE ENTITY: <br /> Intertek Testing Services NA Inc.-ETL/Warnock Hersey—QUA1673;(604)520-3321 <br /> -END OF EVALUATION REPORT- <br /> � Exterior Research and Design,LLC. Evaluation Report 140510.02.12-R2 <br /> Certificate of Authorization N9503 FL15216-R2 <br /> Revision 2:04/27/2015 <br /> Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.