Laserfiche WebLink
=-� _ . <br /> � , ' : ��,� <br /> . . Y � . ������I��a� <br /> '�'' • _ 5.3 Fire C(assification is not part of this Evaluation Report;refer to current Approved Roofing Materials Directory or test <br /> ' report from accredited tesfiing agency for fire ratings of this product. � <br /> 5 Q GAF Synthetic Roof Underlayments may be used with any prepared roof cover where the product is specifically <br /> referenced within FBC approval documents. If not listed,a request may be made to the AHJ for approval based on this <br /> evaluation combined wiih supporting data for the prepared roof covering. <br /> 5.5 Allowa6le roof covers applied atop GAF 5ynthetic Roof Underlayments are follows: <br /> ;i:i� 'iii�!?.a" '.Y,ij�:y.,z'-'.-,-w7;.w.- i2"s�-�`�.-'"- -_��^-•-�s•r— �� " �:.y::.t;.- '��,u- .:5qty. •:y: " `5"' <br /> ,1,'y - _ _ �.4 :X::!- :Ya> ' " -_:�-a-a_ ^��--.. ' yLry. <br /> .�'"r _ ..dT.i� '"''�4.^.. _ '- - '.t ��� <br /> �i-�.t..'�+.'~' ".. ' .:3�': ,•`li.<::•1 " <br /> -.c i_. .. ' <br /> ;t. ��j:, j <br /> .._.^,��d� ' <br /> ' ' - p ~`� $�5• <br /> ':4�'-:�n��= O'�7f I� :ti:^��- <br /> '.=TABLE�.:. A .:s•�� - <br /> l�OOF COVEEi. <br /> '�. ' ' :4.^- .7. f �;C'� ^1:.�:�v�'J;:_'.�: <br /> yh..i1'f.^M 4�i :!S�ii,� �_ _ .�F�• <br /> - : _ ::'F.: .._i•�5 f%+,'^ii��.�'^=:��:f•1N:1�:.v�:�i: �'•.'}�Yi..........r..i i.s __ <br /> 'Y+...n�. ..-G . .. .. r4...�.. _. . <br /> Slate or <br /> Underlayment Asphalt Nail-On Tile Foam-On Tiie Metaf Wood Sfiakes Simulated <br /> Shingles &Shingles Slate <br /> Deck-Armor""Premium <br /> Breathable Roof Deck Yes No No Conta�Mfg Confac�Mfg Contact Mfg <br /> Protection <br /> RaofPro'"'SBS-Madified Yes No � No No Yes Y� <br /> All-Purpose Underlayment <br />� Shingle-Mate°Roof Deck Y� No No No No No <br /> Protection <br /> Tiger PaW""Roof Deck yes No No Coniact MTg. ContacE Mfg. Contact Mfg. <br /> Protection <br /> VersaShield°Fre- <br /> Resistant Roof Deck Yes No No Yes Yes Yes <br /> Protection <br /> 5.6 Exposure Limitations: <br /> 5.6.1 Deck-Armor""Premium Breathable Roof Deck Protection;ftoofPro"''SBS-Modified All-Purpose Underfayment;Shingfe- <br /> Mate°Roof Decl<ProtecEion;StormSafeT"'Anchor Sheet;Tiger Paw"•'Roof Deck Protection shall not be left exposed for <br /> ' ' longerthan 30-days after installation. <br /> 5.6.2 VersaShield°Fire-Resistant Roof Deck Protection shall not be lef�exposedfor longerthan 180-days after installation. <br />, . 6. 1(VSf'ALLATION: <br /> 6.1 GAF Synthetic Roof Underlaymenfis shall be installed in accordance with GAF pu6lished installation instructions subject <br /> to the Limitations set forth in Seciion 5 herein and the specifics noted below. <br /> 6.2 Re fasten any loose decking panels,and check for protruding nail heads. Sweep the substrate thoroughly to remove <br /> any dust and debris prior to appfication. • <br /> 6.3 Deck-Armorn"'Premium Breathable Roof Deck Profiection: <br /> 6.3.1 Install Deck-ArmorT"' Premium Breathable Roof Deck Protection in compliance with manufacturer's published <br /> installation instructions and the requiremen�s for ASTM DZZ6,Type I and II underlayments in FBC Sections 1507 for <br /> the type of prepared roof co�ering to be insealled. <br /> 6.3.2 Fasteners shafl be 1-inch diame�er plas�io-capped corrosion resistant nails or 1-inch diameter plastio-capped,corrosion <br /> resistant staples. <br /> 6.3.3 Optional, or if required by the Authority Having Jurisdiction: Install a leak barrier of LibertyTM SBS Self-Adhering <br /> Base/PIy Sheet;StormGuard°Film Surfaced Leak Barrier; UnderRoofT"'2 Polyester-SurFaced Leak Barrier;UnderRoofiT"" <br /> HT High 7emperature Leak Barrier; WeatherWatch° Mineral Surfaced Leak Barrier or WeatherWatch° XT Mai <br /> SurFaced Leak Barrier at vulnerable feak areas,including but not limited to eaves,valleys,rakes,skylights and dormers. <br /> At eaves and valleys, install the leak barrier prior to installation of t e un er ayment. ong e rake, mstali�he <br /> underlayment,leaving 6 to 8-inch of the deck exposed,and then install the leak barrier over the underlayment and <br /> exposed decking. At other areas,install the leak barrier overthe underlayment. <br /> 6.3.4 For non tile roof installations: <br /> 6.3.4.1 Standard instaliation with Single Layer;roof slope>4:12 <br /> Starting at the eave,fasten the eave edge and 6-inch wide end-laps 6-inch o.c. Fa�en in the field of the roll 12-inch <br /> o.c.in two,equally spaced,staggered center rows. <br /> Exterior Research and Design,LLC. Evaluation Report 01506.03.12-RS <br /> Certificote ofAufhorizotion#9503 FL15487-RS <br /> Revision 5:04/02/2015 <br /> Page 3 of 5 <br />