My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
17-18897
Zephyrhills
>
Building Department
>
Permits
>
2017
>
17-18897
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2018 11:51:49 AM
Creation date
7/31/2018 11:51:47 AM
Metadata
Fields
Template:
Building Department
Company Name
ALPHA VILLAGE
Building Department - Doc Type
Permit
Permit #
17-18897
Building Department - Name
WAITS,JIMMY & THELMA
Address
7212 LANDOVER DR
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I . . - _�°�-_ _ _"` <br /> b ,�_ ` y <br /> ` + w + ������I��� <br /> ��, �� 4. � . <br /> Continue upslope in a similar manner,maintaining minimum 3-inch side-laps and minimum 6-inch end-laps. F�sten 6- <br />' ' inch o.c.in the laps and 12-inch o.c.in two,equally spaced,staggered center r,oU�s in the field. Ensure all end laps are <br /> staggered at least 3 feet aparE. <br /> One the same day,install LibertyT"'SBS Self-Adhering Base/PIy;StormGuard°Film Surfaced Leak earrier;UnderRoo�`"'2 <br /> Polyester-Surfaced Leak Barrier; UnderRoo�"' HT High Teinperature Leak Barrier;WeatherWatch° Mineral Surfaced <br /> Leak Barr•ier or WeatherWatch°XT Mat Surfaced Leak Barrier overthe StormSafeT"'Anchor Sheet, <br /> 6.6 RoofPro�'"SBS-Modified Al!-Purpose Underlavmenfi and Shin�le�Mate°Roof Deck Protec�ion: <br /> 6.6.1 Install RoofProT"° and Shingle-Mate° in compliance with manufac�urer's published instaliation inseructions and the <br /> requirements for ASTM D2Z6,Type I and ll underlayments in FBC Sections 1507 forthe type o;prepared roofcovering <br /> to be instalied. A double layer is required for 2:12<roof slope<4:12. No hammer tacks or staples are permitted. <br /> 6.6.2 Optional, or if required by the Authority Having lurisdiction: Instafl a leak barrier of Li6ertyTM SBS Self-Adhering <br /> Base/Ply Sheet;StormGuard° Film Surfaced Leak Barrier;UnderRootTM'2 Polyester-Surfaced Leak Barrier;UnderRoof�"' <br /> HT High Temperature Leak Barrier; WeatherWatch° Mineral Surfaced Leak Barrier or WeatherWatch° XT Mat <br /> Surfaced Leak Barrier at vulnerable leak areas,including but not lirnited to eaves,valleys,rakes,skylights and dormers. <br /> At eaves and valleys, install the leak barrier prior to installation of the underlayment. Along fhe rake,install the <br /> underlayment,leaving 6 to 8-inch of the deck exposed, and then install the•leak barrier over the underfayment and <br /> exposed decking. At oiher areas,install the leak barrier over the underlayment. <br /> 6.7 VersaShield°Fire-Resistanfi Roof Deck'Protection: <br /> 6.7.1 Install VersaShield° Fire-Resistant Roof Deck Protectlon in compliance with.manufacturer's published installation <br /> � instructions and the requiremenfis for ASTM D226,Type I and II or ASl'M D4869 underlayments in FBC Sections 1507 <br /> for the t}/pe of prepared roof co�ering to be installed. A double layer is required for 2:12<roof slope<4;12. No <br /> hammertacks ors�aples are permitted, <br /> 6.7.2 Optional, or if required by the Authority Having Jurisdiceion: install a leak barrier of LibertyT"" SBS Self-Adhering <br /> Base/Ply Sheet;StormGuard°Flm SurFaced Leak Barrier;UnderRoof""2 Polyester-Surfaced Leak Barrier;UnderRoofr"' <br /> HT High Temperature Leak Barrier; WeatherWatch° Mineral Surfaced Leak Batrier or WeatherWatch° XT Mat <br /> - � Surfaced Leak Barrier at vulnerable leak areas,including but not limited to eaves,valleys,rakes,skylighfis and dormers. <br /> At eaves and valleys, install the leak barrier prior to inscallation of the underlayment. Along the rake,install the <br /> - underlayment,leaving 6 to 8-inch of the deck exposed, and then install the leak barrier over the underlayment and <br /> exposed decking. At other areas,insta(1 the leak barrier over fihe underlayment. <br /> 7, BUILDIIVG PERMIT DiEQUIREMEiVTS: <br /> As required bythe Building Official orAuthor"rty HavingJurisdiction in orderto properly evaluate the installation ofthis product. <br /> 8. MANUFACTURING PLANTS: � <br /> Contact the manufac�urer orthe named QA entity for information on plants covered under Rule 61G20-3 QA requirements. <br /> 9, CtUALITY ASSURAMCE ENTI.lY: <br /> UL,LLC.—QUA9625;(847}664-3281 <br /> -EiVD OF EVALUATION REPORi'- <br /> Exterior Research and Design,LLC. Evaluation Report 01506.03.12-R5 <br /> F115487-RS <br /> Certificate ofAuthorizofion#9503 <br /> Revision 5:0�/OZ/2015 <br /> Page 5 ot 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.