Laserfiche WebLink
NOTICE OF DEED RESTRICTIONS: The undersigned understands that this permit may be subject to"deed"restrictions° <br /> which may be more restrictive than County regulations. The undersigned assumes responsibility for compliance with any <br /> applicable deed restrictions. <br /> UNLICENSED CONTRACTORS AND CONTRACTOR RESPONSIBILITIES: If the owner has hired a contractor or <br /> contractors to undertake work,they may be required to be licensed in accordance with state and local regulations. if the <br /> contractor is not licensed as required by law, both the owner and contractor may be cited for a misdemeanor violation <br /> under state law. If the owner or intended contractor are uncertain as to what licensing requirements may apply for the <br /> intended work,they are advised to contact the Pasco County Building Inspection Division—Licensing Section at 727-847- <br /> 8009. Furthermore, if the owner has hired a contractor or contractors, he is advised to have the contractor(s) sign <br /> portions of the°contractor Block"of this application for which they will be responsible. If you,as the owner sign as the <br /> contractar,that may be an indication that he is not properly licensed and is not entitled to permitting privileges in Pasco <br /> County. <br /> TRANSPORTATION IMPACT/UTILITIES IMPACT AND RESOURCE RECOVERY FEES: The undersigned understands <br /> that Transportation Impact Fees and Recourse Recavery Fees may apply to the construction of new buildings,change of <br /> use in existing buildings,ar expansion of existing buildings,as specified in Pasco County Ordinance number 89-07 and <br /> 90-07,as amended. The undersigned also understands,that such fees,as may be due,will be identified at the time of <br /> permitting. It is further understood that Transportation Impact Fees and Resource Recovery Fees must be paid prior to <br /> receiving a"certificate of occupancy'or final power release. If the project does not involve a certificate of occupancy or <br /> final power release,the fees must be paid prior to pertnit issuance. Furthermore, if Pasco County Water/Sewer Impact <br /> fees are due,they must be paid prior to permit issuance in accordance with applicable Pasco County ordinances. <br /> CONSTRUCTION LIEN LAW(Chapter 773,Florida Statutes,as amended): If valuation of work is$2,500.00 or more,I <br /> certify that I, the applicant, have been provided with a copy of the "Florida Construction Lien Law—Homeowners <br /> Protection Guide"prepared by the Florida Department of Agriculture and Consumer Affairs. If the applicant is someone <br /> other than the"owner", I certify that I have obtained a copy of the above described document and promise in good faith to <br /> deliver it to the"owner°prior to commencement. <br /> CONTRACTOR'S/OWNER'S AFFIDAVIT I certify that all the information in this application is accurate and that all work <br /> will be done in compliance with all applicable laws regulating construction,zaning and land development. Applicatian is <br /> hereby made to obtain a permit to do work and installation as indicated. I certify that no work ar installation has <br /> commenced prior to issuance of a pertnit and that all work wili be performed to meet standards of all laws regulating <br /> construction, County and City codes, zoning regulations, and land development regulations in the jurisdiction. I also <br /> certify that I understand that the regulations of other govemment agencies may apply to the intended work,and that it is <br /> my responsibility to identify what actions I must take to be in compliance. Such agencies include but are not limited to: <br /> - Department of Environmental Protection-Cypress Bayheads, Wetland Areas and Environmentally Sensitive <br /> Lands,Water/Wastewater Treatment. <br /> - Southwest Florida Water Management District-Wells, Cypress Bayheads, Wetland Areas, Altering <br /> Watercourses. <br /> - Army Corps of Engineers-Seawalis,Docks,Navigable Waterways. <br /> - Department of Health & Rehabilitative Services/Environmental Health Unit-Wells, Wastewater Treatment, <br /> Septic Tanks. <br /> - US Environmental Protection Agency-Asbestos abatement. <br /> - Federal Aviation Authority-Runways. <br /> I understand that the following restrictions apply to the use of fill: <br /> - Use of fill is not allowed in Flood Zone"V"unless expressly pertnitted. <br /> - If the fill material is to be used in Flood Zone "A", it is understood that a drainage plan addressing a <br /> "compensating volume"will be submitted at time of permitting which is prepared by a professional engineer <br /> licensed by the State of Florida. <br /> - If the fill material is to be used in Flood Zone "A" in connection with a permitted building using stem wall <br /> construction,I certify that fill will be used only to fill the area within the stem wail. <br /> - If fiIl material is to be used in any area, I certify that use of such fill will not adversely aifect adjacent <br /> properties. If use of fill is found to adversely affect adjacent properties,the owner may be cited for violating <br /> the conditions of the building permit issued under the attached permit application,for lots less than one(1) <br /> acre which are elevated by fill,an engineered drainage plan is required. <br /> If I am the AGENT FOR THE OWNER,I promise in good faith to inform the owner of the permitting conditions set forth in <br /> this affidavit prior to commencing construction. I understand that a separate permit may be required for electrical work, <br /> plumbing, signs, wells, pools, air wnditioning, gas, or other installations not specifically included in the application. A <br /> permit issued shall be construed to be a license to proceed with the work and not as authority to violate,cancel,alter,or <br /> set aside any provisions of the technical codes,nor shall issuance of a permit prevent the Building Official from thereafter <br /> requiring a correction of errors in plans,construction or violations of any codes. Every pertnit issued shall become invalid <br /> unless the work authorized by such permit is commenced within six months of permit issuance,or if work authorized by <br /> the permit is suspended or abandoned for a period of six(6)months after the time the work is commenced. An extension <br /> may be requested, in writing,from the Building Official for a period not to exceed ninety(90)days and will demonstrate <br /> justifiable cause for the extension. If work ceases for ninety(90)consecutive days,the job is considered abandoned. <br /> WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOU�No <br /> PAYING 7WICE FOR IMPROVEMENTS TO YOUR PROPERTY. IF YOU INTEND TO OBT N FINANCING,CONSUL7 o n� � <br /> WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING Y R NOTI OF CO ENCEMENT. <br /> FLORIDA JURAT(F.S.117.03) �o�r��"�`0 <br /> �oR.�n <br /> OWNER OR AGENT CONTRACTOR <br /> Subscribed and swom to(or affirtned)before me this Subscribed and m lo(or affirtned)be me this ���o <br /> bY 1 I—3 a 1"1 by_ YYl A ee_�.5 i Zp• •c�,2� <br /> Who fs/are personally known to me or has/heve produced Wha is/are personelly known to me or has/have produced N 3 � <br /> as identification. as Idenfificafion. `� �c <br /> � � <br /> � �N,� (j <br /> �J O� � � <br /> Notary Public lJi�n Notary Public o��Q <br /> Commissfan No. Commission No. l J��-CJc��1�`) N T <br /> �1(`(lfl-Q.� \/� S 1�tJ�-�i W � <br /> Neme of Notery typed,printed or stamped Name of Note typed,printed or stamped <br />