My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
17-19145
Zephyrhills
>
Building Department
>
Permits
>
2017
>
17-19145
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2018 9:55:26 AM
Creation date
9/20/2018 9:52:55 AM
Metadata
Fields
Template:
Building Department
Company Name
ZEPHYR RIDGE
Building Department - Doc Type
Permit
Permit #
17-19145
Building Department - Name
O'NEIL,SHEA K
Address
37704 NEWPORT DR
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� ,i ' <br /> �'�I� Bruce Bussell <br /> Engineering Manager <br /> i ������ Palm Harbor Homes,Inc. <br /> 605 Soufh Frontage Road <br /> Plarn City,Florida 33563-9934 <br /> Phone:813-752-1368 Exf.756 <br /> ����� Fax 1:813-754-8675 <br /> Fax 2:813-719-3689 <br /> E-Mail:bbussell@palmharbor.com <br /> December 19,2017 <br /> To: Building Department <br /> RE: Palm Harbor Home, Serial Number 20965 <br /> David O'Neil <br /> 37704 Newport Dr <br /> Zephyrhills FL 33542 <br /> Dear Plans Examiner, <br /> The site-beam, which was installed by Palm Harbor Homes, and is approved by HUD, <br /> Manufactured Home Construction& Safety Standards, is constructed to receive on-site <br /> additions that are built and designed by others to accommodate such amenities as <br /> carports, sheds, and screen rooms. The on-site structure must be designed by a Florida, <br /> registered, engineer,to the Florida Building Code and all local codes. This plant- <br /> installed site beam is of adequate design for this purpose as long as tie downs and piering <br /> are per page 1 of Section 11, Misc. &Final Inspection section of the installation inanual <br /> (attached). The attached details, EW-216.2 and PA69-EW-31, are approved by the <br /> Manufactured Home Construction& Safety Standards. And, the design loads for the <br /> plant-installed site beam, as well as the supporting structure and anchorage are from the <br /> FBC and ASCE 7. <br /> I can be of further assistance at the above contact information. <br /> Sincerely yours, <br /> Bruce Bussell <br /> Engineering Manager <br />
The URL can be used to link to this page
Your browser does not support the video tag.