Laserfiche WebLink
� . <br /> �y�� Worldwide <br /> Fire Protection Contacts W�'�co-fire.com <br /> Products <br /> Series TY-L — 5.6 and 8.0 K-factor <br /> Upright, Pendent, and Recessed Pendent Sprinklers <br /> Standard Response, Standard Coverage <br /> corrosive environment. The effects of �T�:---.�:. ��. <br /> General ambient temperature,concentration of �"' � <br /> � � chemicals, and gas/chemical velocity, `� � -�`�� �' �� ��=:-. <br /> Descr►pt�on should be considered, as a minimum, � <br /> along with the corrosive nature of the <br /> The TYCO Series TY-L, 5.6 and ,'��' � --��=��^•, ;�� <br /> 8.0 K-factor, Upright, Pendent, chemical to which the sprinklers will be - <br /> and Recessed Pendent Sprinklers exposed. _ �,,� <br /> described in this data sheet are stan- An intermediate level version of the - � �r-�,�-,_��� <br /> dard response, standard coverage, Series TY L Pendent Sprinkler can be �:r �=� <br /> solder type spray sprinklers designed obtained by utilizing the Series TY-L - ': ;,_� <br /> for use in light, ordinary, and extra Pendent Sprinkler in combination with ���.. <br /> hazard,commercial occupancies such the Model S Shield. -- V `:=r ,'��'`" <br /> as banks, hotels, shopping malls,fac- _ �-�--:;�;�� <br /> tories,refineries,chemical plants,etc. ,� �""'m <br /> The recessed version of the Series The TYCO Series TY-L, 5.6 and 8.0 - <br /> TY-L Pendent Sprinkler, where appli- K-factor, Upright and Pendent Sprin- i!"�' „�;. ". '\, <br /> cable, is intended for use in areas with k/ers described herein must be � �� � - - � <br /> a finished ceiling. It uses a two-piece installed and maintained in compliance .-' f`� `� . :��`:;�,, <br /> Style 20(1/2 inch NPT)or Style 30(3/4 with this document,as well as with the - ��� ^. <br /> inch NP� Recessed Escutcheon.The applicable sfandards of the National � � y P-'`.�' <br /> Recessed Escutcheon provides 1/4 in. Fire Protection Association,in addition -� ,� ;i;�';.' <br /> (6,4 mm)of recessed adjustment or up to the standards of any ofher authori- ��' � <br /> to 1/2 in.(12,7 mm)of total adjustment ties having jurisdiction.Failure to do so �, � <br /> from the flush pendent position. The may impair the pertormance of these j <br /> adjustment provided by the Recessed devices. <br /> Escutcheon reduces the accuracy to The owner is responsible for main- �_�;; <br /> which the fixed pipe drops to the sprin- � � � � <br /> klers must be cut. taining their fire protection system <br /> and devices in proper operating con- <br /> Corrosion resistant coatings, where dition. Contact the installing contrac- <br /> applicable,are utilized to extend the life for or product manufacturer with any <br /> of copper alloy sprinklers beyond that questions. <br /> which would otherwise be obtained <br />' when exposed to corrosive atmo- Sprinkfer <br /> spheres. Although corrosion resistant <br /> coated sprinklers have passed the ,�entification <br />, standard corrosion tests of the appli- <br /> cable approval agencies,the.testing is ��mber (SIIV) <br />, not representative of all possible cor- <br /> rosive atmospheres. Consequently, TY3111. .. . . .0 ri ht 5.6K, 1/2" NPT <br /> it is recommended that the end user TY3211 . . . .Pendent 5.6K 1/2" NPT <br /> be consulted with respect to the suit- TY4111. .. . . Upright 8.OK,3/4" NPT <br /> ability of these coatings for any given TY4211. . . . .Pendent 8.OK,3/4"NPT <br /> TY4811 . . . . .Upright 8.OK,1/2"NPT <br /> IMPORTANT TY4911 . .. .Pendent 8.OK,1/2"NPT <br /> Always refer to Technical Data TY3111 is a re-designation for S1800 <br /> Sheet TFP700 for the `7NSTALLER and G3111. <br /> WARNING" that provides cautions TY3211 is a re-designation for S1801 <br /> with respect to handling and instal- and G3112. <br /> lation ofsprinklersystems and com- TY4111 is a.re-designation for S1810 <br /> ponents. Improper handling and and G3101. <br /> installation can permanently damage TY4211 is a re-designation for S1811 <br /> a sprinkler system or its compo- and G3102. <br /> nents and cause the sprinklei to fail TY4811 is a re-designation for S1805. <br /> to operate in a fire situation or cause TY4911 is a re-designation for S1806. <br /> it to operate prematurely. <br /> Page 1 of 6 NOVEMBER 2015 TFP110 <br />