My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
18-19188
Zephyrhills
>
Building Department
>
Permits
>
2018
>
18-19188
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2018 11:41:21 AM
Creation date
9/20/2018 11:27:36 AM
Metadata
Fields
Template:
Building Department
Company Name
SILVERADO
Building Department - Doc Type
Permit
Permit #
18-19188
Building Department - Name
DR HORTON INC
Address
6711 WAGON TRAIL ST
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FLORIDA ENERGY EFFICIENCY CODE <br /> FOR BUILDING CONSTRUCTION <br /> Envelope Leakage Test Report <br /> Prescriptive and Perforrnance Method . <br /> Project Name: Cali Elevation D Builder Name: DRH Express Homes <br /> Street: Permit Office: <br /> City,State,Zip: Zephyrhilis,FL, Permit Number: <br /> Design Location: FL,Tampa Jurisdiction: �I <br /> Cond.Floor Area:: 1828 sq.ft. Cond.Volume: 15849 cu ft. I <br /> Envelope Leakage Test Results Leakage Characteristics <br /> Regression Data: <br /> C: n: R: <br /> CFM(50): <br /> Single or Multi Point Test Data <br /> HOUSE PRESSURE FLOW: ELA: <br /> 1 Pa cfm EqLA: <br /> 2 Pa cfm ACH: <br /> 3 Pa cfm- <br /> ACH(50): <br /> 4 Pa cfm <br /> 5 Pa cfm S�� <br /> 6 Pa cfm <br /> R402.4.1.2 Testing. The building or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding 5 air changes per hour <br /> in Climate Zones 1 and 2,3 air changes per hour in Climate Zones 3 through 8.Testing shall be conducted with a blower door at a pressure of 0.2 <br /> inches w.g.(50 Pascals).Where required by the code official,testing shall be conducted by an approved third party A written report of the results of the <br /> test shall be signed by the party conducting the test and provided to the code official.Testing shall be performed at any time after creation of all <br /> penetrations of the building thermal envelope. <br /> During testing: <br /> 1.Exterior windows and doors,fireplace and stove doors shall be closed,but not sealed,beyond the intended weatherstripping or other <br /> infiltration control measures; <br /> 2.Dampers including exhaust,intake,makeup air,backdraft and flue dampers shall be closed,but not sealed beyond intended infiltration <br /> control measures; _ <br /> 3.Interior doors,if installed at the time of the test,shall be open; <br /> 4.Exterior doors for continuous ventilation systems and heat recovery ventilators shall be closed and sealed; <br /> 5.Heating and cooling systems,if installed at the time of the test,shall be turned off;and <br /> 6.Supply and return registers,if installed at the time of the test,shall be fully open. <br /> I hereby certify that the above envelope leakage W here required by the code official, �fS�E ST,q�,� <br /> performance results demonstrate compliance testing shall be conducted by an � , , "� _ � � �,,�, <br /> rii�. �?5.a�. <br /> with Florida Energy Code requirements in approved third party. A written � '�r• ` `'s' - <br /> ,, . <br /> accordance with Section R402.4.1.2. report of the results of the test shall � 'r"'r�'"°�;;';''�'„�"�`'+�� <br /> be signed by the third party c� 5��=.._ t7 <br /> conducting the test and provided to � '����� n �' <br /> SIGNATURE: the code official. ' <br /> PRINTED NAME: j���D����� <br /> BUILDING OFFICIAL: <br /> DATE: - <br /> DATE: <br /> 1 0/30/201 7 2:02 PM EnergyGauge�USA-FlaRes2014 -Section R405.4.1 Compliant Software Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.