Laserfiche WebLink
�EIN�'�AU� <br /> � INSPECTIONS &FORENSIC,INC. <br /> 3868 Sun City Center Blvd. Ph.813-633-8000 <br /> Sun City Center,Fl.33573 Fx.813-464-8026 � <br /> � <br /> �� 1 � <br /> CONCRE�'E SL�4�/FO�INDA7'101� <br /> INSPECT�ON IZEl'OR T <br /> INSPECTION DATE: 02/26/2018 <br /> CLIENT/Community: D.RH-TAMPA/ Silverado <br /> LOT#(s)/ADDRESS: # 43/6 / 6711 Wagon Trail <br /> SUPERINTENDENT: Chris Tallant <br /> WEATHER: 72 sunny <br /> INSPECTION CRITERIA/PROTOCOL <br /> PASS FAIL <br /> OBSERVED&INSPECTED <br /> 1. Verify Soil Compaction Report in permit box(if req.by jurisdiction X <br /> 2. Verfiy slab thickness formed is per permitted plans X <br /> 3. Verify exterior wall footing excavation free of debri X <br /> 4. Verify exterior wall footing reinforcing steel size and quantity per plans X i <br /> Verify isolated or monolithic footing pad reinforcing steel size and quantity X I <br /> 5' are per plans <br /> 6. Verify isolated or monolithic footing pad locations are per plans X <br /> Verify that all continuous interior monolithic thickened slab foundations are X <br /> �' width and depth per plans <br /> Verify that all continuous interior monolithic thickened slab foundations are X <br /> g' correctly located per plans <br /> 9 Verify slab welded wire reinforcing is gage and grid dimension specified on X I <br /> plans <br /> Verify that all welded wire slab reinforcing is lapped.per plans or Code <br />, 10. referenced standard whichever is greater X , <br /> Verify that all welded wire slab reinforcing is properly chaired each way at X <br /> 11. 36"o/c <br /> 12. Verify vapor barrier is per plans for type and millage X <br /> „ Verify vapor barrier is installed in accordance with manufacturer's X <br /> 1�. <br /> recommendations <br /> i 14. Verify all seams are taped and conduit penetrations taped X <br />