Permit #
18-19199
Building Department - Name
SANDELL,DAVID & CATHY
Address
5212 21ST ST
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SMA SB6.0-US Inverter with Hyundai HIS-S290RG Modules <br /> 6.96 kW DC Photovoltaic System Electrical Diagram with (2) Series Strings of 12 Modules <br /> 00 � $ � <br /> Optional Supply Side Connection <br /> Tomverter NEC705.12A 5290 (12)Hyundai HiS-S290RG <br /> RG — #12 290 Watt Modules in series <br /> L1 <br /> G N M <br /> N6 bare copper <br /> GEC (3)p 6 UtilRy meter <br /> THHN?HWN-2 <br /> I 3/4"PVCconduR z00A S290 � <br /> 60 A fused RG #�2 <br /> d�o��a�tw�tn = Hyundai HiSS290RG <br /> 35A fuses ��m9 Ma'vi DistnLution <br /> electrode P�el SMA SB 6.0-US Inverter <br /> Module Specifications Max.Input DC Voltage: 600 VDC <br /> 4)#10 AWG PV Wire 3-R,3-B (1)#6 AWG Bare Copper Pmax: 290 Wp <br />� Voc: 38.8 V Max ISC per string: 18 A <br /> 200A Panelboard with MPPT Range: 100-550 VDC <br /> 200A Main breaker Vmpp:32.0 V Max Output Voltage:240 VAC <br /> (4)#10 AWG THHNITHWN-2 Isc: 9.7 A <br /> O Z-B�2-R Impp: 9.1 A Max Output current: 25 A(AC) <br /> zooA-2 (1)#s AWG THHN/THWN-2 .C.Voltage: -0.30%/C AC Nominal Power: 6000 Watts <br /> O 1-G <br /> 3/4"EMT,FiNC(inside structure Notes: All work to meet or exceed NEC 2071 <br /> 10 OO LFNC,PVC(outside structure) <br /> 690.37E 1 Junction box to be located within the array boundary. Junction box must be minimum Nema 3R UL listed <br /> Nema 3R enclosure.Free air conductors must be installed in raceway if readily accessible as per 690.31(A). <br /> 11 2 The minimum volume of the Nema 3R enclosure for the transition of PV wire to THWN-2 wire shall be <br /> 35A/2 Junction <br /> i Box 42 cubic inches. Heyco 5 wire Masthead gland seals or similar connector are required as strain relief <br /> i for PV wire into Nema 3R junction box at array. <br /> � � i SMA Sunny Boy 6.0-US g Interconnection with 35 Amp 2 pole OCPD via 2011 NEC 705.12(D)(2)Load Side Connectipn. The 35 A <br /> Transformerless Inverte backfed breaker must be located at the opposite end of the bus from the 200 A main supply breaker <br /> exfsting � oc with integrated DC 4 The required PV Backfed breaker plus the main breaker rating must be less than or equal to 120%of <br /> grounding � � nc disconnect the Main service bus rating. 705.12(D)(2) <br /> electrode 5 Optional Supply Side connection via 705.12A using parallel line taps in a NEMA 3R box(as required) <br /> � (4)#8 AWG THHN/THWN- <br /> i . using NSI IPCS4002, Ilsco IPC-KUP-L or NSI Tork IPLD 3/0-3 Multi-Tap Connector or equivalent. <br /> 1-B,1-R,1-W,1-G <br /> � i 6 PV service disconnecting means for"optional"supply side connection must have neutraU EGC bond <br /> \ \ � i 3/4"EMT,FMC,LFNC, W�thin and must be listed as"suitable for use as service equipment." 230.66 <br /> b b � or PVC <br /> � � The fuses in the disconnect for the"supply side"option must be rated to handle the maximum short- <br /> p � - -•-•-•-•� circuit current available at the supply terminals.110.9,110.10 Over-current protection for the supply side <br /> connected conductors shall be located within 10 feet of the connection to the service. 705.31 <br /> (4)#8 AWG THHN/THWN-2 g Grounded conductor shall be routed with ungrounded conductors to PV Service disconnecting means as <br /> 1-B,1-R,1-W,1-G per 250.24(C)if"Supply Side"option is used. <br /> 3/4"EMT,FMC,LFNC,or PV 9 For"Supply Side option" Continuous or irreversibly spliced Grounding Electrode Conductor installed <br /> per 250.24(D). Grounding Electrode Conductor shall be specified as per 250.64 and sized per 250.66 <br /> 10 The following label is required on meter can and main panelboard"Services fed from dual power sources <br /> 60A 240V AC Disconnect with label: 13 Utility and Photovoltaic system" <br /> �� "PV input Do not relocate this OCPD"label required adjacent to backfed breaker. 705.12(d)(7) <br /> On-site Utility Generation DC Disconnect Label Requirements 92 Bonding of module to rail and module to module accomplished through WEEB washers or self grounding <br /> Disconnect Switch(IF REQUIRED BY UTILITY) <br /> Vmpp 384 VDC mid-clamps. , <br /> PV AC Disconnect Label Requirements VmaX 500.5 VDC 13 "Warning:DC conductors of this system are ungrounded and may be energized"required on the <br /> Operating Current:25 A Impp 18.2 A DC Disconnect 690.35F <br /> Operating Voltage:240 VAC ImaX 24.25 A 14."Warning:Photovoltaic Power Source"label required on conduit per 690.31 (E)(3)(4) <br /> 15. Total voltage drop°/a for all circuits based on listed conductors is 1.46% <br />