My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
18-19208
Zephyrhills
>
Building Department
>
Permits
>
2018
>
18-19208
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/21/2018 8:45:22 AM
Creation date
9/21/2018 8:45:21 AM
Metadata
Fields
Template:
Building Department
Company Name
EMERALD POINTE RV RESORT
Building Department - Doc Type
Permit
Permit #
18-19208
Building Department - Name
JONES,TERRY & BARBARA
Address
3514 ALABASTER DR
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, • ; <br /> . < <br /> ^ � ��.-��' �c.�_ �, 1 �3'/� ��a-—'z'4'��. <br /> � <br /> Procedur@ far Lot lmprovement Requests <br /> (Please refer to the "Ruies and Regulations") Permit No�!Q �� <br /> 1.Ai1 requests ere to go to the Chairman of the Lot Improvement Committee, You can hand deliver it to the <br /> Chairman or piace it in the EPPOA mail box outside the EPPOA Office.The Chairman wifl present it to the Lot <br /> improvement Cornmittee for tneir review on a weekly basis. <br /> 2.Any request which is NOT filled out proper�y,will be returned to the appticant wiihout an adion being taken. <br /> 3.The Committee will review�II requests and visit the site of the request as necessary, <br /> 4_Ai�er the Committee has recommended approval or denial of the request, ii will be presented to the 8oard ef <br /> Directors for lheir approval or denial.The final decision of tfle Bo�rd to approve or deny the request must be <br /> madE by at least tnree(3)directa.�s, one of which must be the Board iiaison of the Lat Irnprovem�nt <br /> Cammittee, if 8vailable. <br /> 5,�here wili be NO more ono day approvals or last minuta approvals. Request will take 7 to 1�days far <br /> appropriate review and consideration, tif n�cessarvl thus giving the Gommittee and Board memb�rs time ta <br /> review and consider the requesi in a thorough manner. <br /> 6.The anginal request will be dated and slgned as approved or denied, and aftcr being copied the orig�nal will <br /> gn ir�to fo the mernbers file and the copy retumed io the Lot owner by the Board af Director liaison or the ' <br /> Chairman of the cammittee. - <br /> 7.The committee will follow up on requests ta determine lhat the request as preser�ted and approved is being <br /> adhered fo. <br /> , <br /> �i.Any permit wi11 be AGCEPT�D FOR APPRQVAL between October 1�an Anrit 1 of each ye�r, however, ; <br /> ,e�ch owner must underst��d and krtow thece must be enough memhePs of ti7e Committee ta revlew ' <br /> and recomrnend to the Board for their appro�al. <br /> 4.Any changes made on a previous�y approved project must be r�submlttesi before beginning thQ <br /> changes. <br />' 1G.It is recommended that property owners of mfljor improvements��r ncw co�tstruCtion projeets rcyuest ' <br /> an appaintment with the lot improv�ment committee to rcvi�w plans and answer any que�tians that may , <br /> �rise. <br /> As the owner of Lot# ���� .--, I understand the Lot {mprovemeM Committee and/or the � ' <br />' Bo�i'd of Directors will ent�r the property to follow the extemal progress of fhe construction or , <br /> improvement. as submitted on the Lot lmprovement Request. � <br /> �1.L RH(jUr;S'1'S tV1UST CONf�LY WITH CUl�RENT RLQUIRED P�KMTl'S I'ROMTTTF. C1TY Or' <br /> Y.l;P1iYRHII,LS,PASC�C' NTY,UK 5'111TE OP'F1.ORiD.q c:uxxr;rlT BUILrnN�cc�Dr;s. � <br /> �l � <br /> lG� � ` � . i <br /> .` ,�+ �,�t ' <br />� Lot OwneCs 3ignat � Dat� � <br /> � <br /> OF lotlmp�p,odt 1�124f2Q15 ' <br />
The URL can be used to link to this page
Your browser does not support the video tag.