Laserfiche WebLink
TRINIl1��E�� <br /> 6. INSTALLATION: <br /> 6.1 EverGuard� TPO Single-Ply Roof Membrane Systems shall be installed in accordance with GAF published � <br /> installation instructions,subject to the Limitations/Conditions of Use noted herein. <br /> 6.2 System attachment requirements for wind load resistance are set forth in Appendix 1. "MDP" = Maximum <br /> Design Pressure is the result of testing for wind load resistance based on allowable wind loads,and reflects the <br /> ultimate passing pressure divided by 2 (the 2 to 1 margin of safety per FBC 1504.9 has already been applied). <br /> Refer to FBC 1609 for determination of design wind loads. <br /> 6.3 For mechanically fastened membrane systems(Type D) over profiled steel deck, membrane shall be installed <br /> running perpendicular to steel deck flutes. <br /> 7. BUILDING PERMIT REQUIREMENTS: <br /> As required by the Building Official or Authority Having Jurisdiction in order to properly evaluate the installation of this <br /> product. � <br /> 8. MANUFACrURING PLANTS: <br /> Contact named QA entity for details on manufacturing facilities covered for QA under F.A.C. Rule 61G20-3 <br /> requirements. <br /> 9. QUALITY ASSURANCE ENTITY: <br /> UL,LLC—QUA9625;(847)664-3281;k.chancellor@ul.com <br /> -THE 94-PAGES THAT FOLLOW FORM PART OF THIS EVALUAT/ON REPORT- <br /> Exterior Research and Design,LLC. Evaluation Report 01506.09.05-R28 <br /> Certificate of Authorization#9503 6'"EDITION{2017)FBC NON-HVHZ EVALUATION FL5293-R27 <br /> GAF EverGuard�TPO Single-Ply Roof Membrane Systems Revision 28:30/17/2017 <br /> Page 6 of 6 <br />