Laserfiche WebLink
� 1��� <br /> �� _ <br /> L W AU� <br /> i INSPECTIONS &FORENSIC,INC. <br /> 3868 Sun City Center Blvd. Ph.813-633-8000 <br /> Sun City Center,Fl.33573 Fx.813-464-8026 <br /> CONCI�ETE�'LAB/�'DUlOrDATlON <br /> INS`PECTIDN REPORT <br /> � <br />, INSPECTION DATE: 02/26/2018 ��, <br /> CLIENT/Community: D.RH-TAMPA/ Silverado j <br /> LOT#(s)/ADDRESS: # 13/6 / 6552 Wagon,Trail <br /> SUPERINTENDENT: Chris Tallant j <br /> WEATHER: 72 sunny ! I <br />' i � <br /> INSPECTION CRITERIA/PROTOCOL I <br /> PASS FAIL <br />' OBSERVED&INSPECTED <br /> 1. Verify Soil Compaction Report in permit box(if req.by jurisdiction X <br /> 2. Verfiy slab thickness formed is per permitted plans X <br /> 3. Verify exterior wall footing excavation free of debri X <br /> 4. Verify exterior wall footing reinforcing steel size and quantity per plans X <br />, Veri isolated or monolithic footin ad reinforcin steel size and uanti <br /> fY g P g q tY <br /> 5' are per plans X ; <br /> 6. Verify isolated or monolithic footing pad locations are per plans X <br /> Verify that all continuous interior monolithic thickened slab foundations are X <br /> �' width and depth per plans <br /> Verify that all continuous interior monolithic thickened slab foundations are X <br /> g' correctly located per plans <br /> 9 Verify slab welded wire reinforcing is gage and grid dimension specified on X <br /> plans <br /> Verify that all welded wire slab reinforcing is lapped per plans or Code <br /> i 1�' referenced standard whichever is greater X <br /> Verify that all welded wire slab reinforcing is properly chaired each way at X <br />' 11. 36"o/c ' <br /> 12. Verify vapor barrier is per plans for type and millage X <br /> „ Verify vapor barrier is installed in accordance with manufacturer's X li <br /> 1'' recommendations <br /> 14. Verify all seams are taped and conduit penetrations taped X � <br />