My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
18-19237
Zephyrhills
>
Building Department
>
Permits
>
2018
>
18-19237
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/21/2018 9:20:42 AM
Creation date
9/21/2018 9:20:40 AM
Metadata
Fields
Template:
Building Department
Company Name
SILVERADO
Building Department - Doc Type
Permit
Permit #
18-19237
Building Department - Name
DR HORTON INC
Address
6679 WAGON TRAIL ST
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FORM R405-2014 � . <br /> Florida Department of Business and Professional Regulations <br /> ' ' Residential Vilhole Btaildir� Performanca and Prescri tive Methods <br /> ADDRESS: Permit Number: <br /> ' `� Zephyrhills,F!., - <br /> MANDATORY REQUIREMENTS �ee individual code sections for fu!! details. <br /> � 401.3 Energy Performance Levet(EPL}dispiay card(Mandatory}. The bui(ding official shall require that an energy p.erformance level(EPL) <br /> display card be completed and certified by the builder to be accurate and correct before final approval of the building for occupancy.Florida law <br /> [Section 553.9085,F3orida Statues]requires the EP�disp(ay card to be included as an addendum to each sales cantract far bafh presold and <br /> nonpresold residentiai buiidings.The EPL display card contains information indicating the energy performance�evei and efficiencies of components <br /> instalied in a iiwelling unit.The building official shall verify that the EPL display card completed and signed by the builder accurately reflects the plans <br /> and spec'sfications submitted to demonstrate compliance for ihe building.A capy of the EPl..disp3ay card can be fot�nd in Appendix C. <br /> � R402.4 Air leakage(Mandatory). The building thermal envelope shall be constructed to limit air leakage in accordance with the requirements of <br /> Sections R402.1 through R402.4 4. <br /> Q ffi402.4.1 Buiiding thermai enveiope. The buiiding thermal envelope shall compiy with.Sections R402.4.1.i and R402.4.1.2.The <br /> sealing methods between dissimilar materials shall allow for differential expansion and contraction. <br /> � R402.4.t.1 Instatlation. The components of the building thermal envelope as(isted in Tabie R402.4.t.i shali be instailed in <br /> accordance with the manufacturer's instructions and the criteria listed in Table 402.4.1.1,as applicable to the method of construction. <br /> Where required by the code officiai,an approved third party sMaU inspect aii compone�ts and verify cornpliance. <br /> � R402.4.1.2 Testing. The building or dweiling unit shall be tested and verified as having an air leakage rate of not exceeding 5 air <br /> changes per hour in Glimate Zones 1 and 2,and 3 air changes per hour in Climate Zones 3 through 8.Testing shaU be conducted wifh <br /> a blower door at a pressure of 02 inches w.g.{5d Pascals}.Where required by the code official,testing shall be conducted by an <br /> approved third party.A written report of the results of the test shall be signed by the party conducting the test and provided to the code <br /> officiaL Tesfing shall be pertormed at any time after creatian of a!!penetrations of the building thermal envelape. ` <br /> During testing: <br /> 1.Exterior windows and doors,fireplace and stove doors shall be closed,but not sealed,beyond the intended weatherstripping or <br /> ather infiltratian contrc�[measures; <br /> 2,Dampers including exhaust,intake,makeup air,backdraft and flue dampers shall be closed,but not sealed beyond intended <br /> infiltration control measures; <br /> 3.lnteriar daors,if installed at the time af the test,shall be open; <br /> 4.Exterior doors for continuous ventilation systems and heat recovery ventilators shall be closed and sealed; <br /> 5.Heating a�d cooling systems,if installed at the time of the test,shall be turned off;and <br /> 6.5upply and retum registers,if installed at the time af the test,st�all be fiully apen. <br /> O RR02.4.2 Fireplaces. New wood-buming fireplaces shall have tight-fitting flue dampers and outdoor combustion air. <br /> O R402.4.3 Fenestration air leakage.Windows,skylights and siidi�g glass daars shal(have an air infiltration rate af no more than 0.3 cfm <br /> . per square foot(1.5 Us/m2),and swinging doors no more than 0.5 cfm per square foot(2.6 Us/m2),when tested according to NFRC 400 or <br /> AAMA/WDMAlCSA 101/1.5.2/A44.0 by an accredited,independent laboraiory and listed and labeled by the manufacFurer. <br /> Exception: Site-built windows,sky(ights and doors. <br /> O R402.4.4 Hecessed iighiing. Recessed luminaires installed in the building ihermal env�lape shali be sealed to limit air feakage <br /> befween conditioned and unconditioned spaces.AlI recessed luminaires sha(1 be(Grated and labeled as having an air leakage rate not <br /> more than 2.0 cfm(0.944 Us)when tested in accordance with ASTM E 283 at a 1.57 psf(75 Pa)pressure differentiai.All recessed <br /> luminaires shal!be sealsd with a gasket or caulk between The hausing and the interiar wall or ceifing covering. <br /> � R4Q3.1.1 Thermostat provision(Mandatary). At least one thermostat shall be provided far each separate heating and cooling system. <br /> � R4Q3.1.3 Neat pump sappiementary heat(Mandatory). Heat purnps having supplementary efectric-resistance heat shall have conirals <br /> thak,excep#during defrost,prevent supp(emental heat operation when the heat pump compressor can meet the heating load... <br /> � R403.2.2 Sealing(Mandatory)A!!ducts,air handlers,and filter boxes and buifding cavities Fhat form the primary air containment <br /> passageways for air distribution systems shall be considered ducfs and plenum chambers,shall be consfructed and sealed in accordance <br /> with Section C403.2.7.2 of the Commercial Provisions of this code and shall be shown to meet duct tightness criteria by post-construction <br /> or rough-in testing below <br /> Duct tightness shall be verified by testing to Section 803 of the RESNET Standards by either an energy rater certified in accordance with Section <br /> 553.99,Florida Statutes,or as authorized by Florida Statutes,to be"'substantially leak free"by either of the following: <br /> 1. Past-canstruction test:Total{eakage sha[(be Iess than or equa(to 4 cfm(i i 3 Umin}per 100 square feet(9.29 m2}of conditioned floor area <br /> when tested at a pressure differential of 0.1 inches w,g,(25 Pa)across the entire system,including the manufaoturer's air handler enclosure.All <br /> register baots shai be taped ar othernise sealed during the tesi. <br /> 2. Rough-in test;Total leakage shall be less than or equal to 4 cfm(113 Umin)per 100 square feet(9.29 m2)of conditioned floor area when tested <br /> � at a pressure differential of 0.1 inches w.g.(25Pa)across the system,including the manufacturer's air handler enctosure.AD registers sha!!be <br /> taped ar otherwise sealed during ttte test.If the air handler is not installed at the time of the tes#,tafat leakage shall be less than ar equai ta 3 cfrn <br /> (85 Umin)per 100 square feet(9.29 m2)of conditioned floor area. <br /> Exceptians: <br /> _ 1. The total leakage test is not required for ducts and air handlers located entirely within the building envelope. <br /> 2. Duct testing is not manda#ary for bui3dings complying by Sectian R405 af this code. <br /> iA134l20'17 1:17 PM EnergyGaugeC�USA-FlaRes24'14 -Section R4Q5.4.i Corri Page i of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.