Laserfiche WebLink
. <br /> FLORIDA ENERGY EFFICIENCY CODE <br /> _ FOR BUILDING CONSTRUCTION <br /> , Envelope Leakage Test Report <br /> Prescriptive and Performance Method <br /> Project Name: Cali Elevation C Buiider Name: DRH Express Homes <br /> - Street: Permit Office: <br /> City,State,Zip: Zephyrhills; FL, Permit Number: <br /> Design Location: FL,Tampa Jurisdiction: <br /> Cond.Floor Area:: 1828 sq.ft. Cond.Volume: 15849 cu ft. <br /> Envelope Leakage Test Results Leakage Characteristics <br /> Regression Data: <br /> C: n: R: <br /> "� CFM(50): <br /> Single or Multi Point Test Data <br /> HOUSE PRESSURE FLOW: E�' <br /> 1 Pa cfm EqLA: <br /> 2 Pa cfm ACH: <br /> 3 Pa cfm <br /> ACH(50): <br /> 4 Pa cfm <br /> 5 Pa cfm S�' - <br /> 6 Pa cfm <br /> R402.4.1.2 Test'Ing. The building or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding 5 air changes per hour <br /> in Climate Zones 1 and 2,3 air ohanges per hour in Climate Zones 3 through 8.Testing shall be conducted with a blower door at a pressure of 0.2 <br /> inches w.g.(50 Pascals).Where required by the code official,testing shall be conducted by an approved third party.A written report of the results of the <br /> test shall be signed by the party conducting the test and provided to the code official.Testing shall be performed at any time after creation of all <br /> penetrations of the building thermal envelope. <br /> During testing: <br /> 1.Exterior windows and doors,fireplace arid stove doors shall be closed,but not sealed,beyond the intended weatherstripping or other <br /> infiltration control measures; <br /> 2.Dampers including exhaust,intake,makeup air,backdraft and flue dampers shall be closed,but not sealed beyond intended infiltration <br /> . control measures; <br /> 3.Interior doors,if installed at the time of the test,shall be open; <br /> 4.Exterior doors for continuous ventilation systems and heat recovery ventilators shall be closed and sealed; <br /> ' 5.Heating and cooling systems,if installed at the time of the test,shall be turned off;and <br /> 6.Supply and return registers,if installed at the time of the test,shall be fully open. <br /> I hereby certify that the above envelope leakage Where required by the code official, f'���5�'.�� <br /> performance results demonstrate compliance testing shall be conducted by an �.w�,,, ;;�o,�, <br /> ,,e � <br /> with Florida Energy Code requirements in approved third party. A written � ���. "'�` � . <br /> E. �rr�,. �„ :� ,,3'°„ � <br /> accor dance with Section R402.4.1.2. report of the results of the test shall � �"%_�'�` a <br /> - be signed by the third party - � ...� ,����.,. �r ~ ,�, � C <br /> conducting the test and provided to � ���� � �' - <br /> SIGNATURE: the code official. - * � <br /> � <br /> ���D yyE"��� i <br /> PRINTED NAME: • <br /> DATE: <br /> BUILDING OFFICIAL: <br /> ' DATE: <br /> 1 0/30/201 7 1 2:59 PM EnergyGaugeO USA-FlaRes2014 -Section R405.4.1 Compliant Software Page 1 of 1 <br />