My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
18-19269
Zephyrhills
>
Building Department
>
Permits
>
2018
>
18-19269
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/21/2018 10:44:58 AM
Creation date
9/21/2018 10:41:58 AM
Metadata
Fields
Template:
Building Department
Company Name
CULVERSON RESTAURANT
Building Department - Doc Type
Permit
Permit #
18-19269
Building Department - Name
S & L PROPERTIES ZEPHYRHILLS LLC
Address
6386 GALL BLVD
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. � <br /> S. Instaifation Techniques <br /> 3MT"' Fire Barrier Duct Wrap 615+shauld be installed per the application design listing in accordance with the <br /> failawing basic installation instructions. <br /> A. Materia!and Equipmen# C. Preparatory Work <br /> ' •3MT"" Fire Barrier Duct Wrap 615+ blanket, 1-1t2 in. 3MT"^ Fire Barrier Duct Wrap 615+ is installed with <br /> (38 mm�thick2, 24 in. (60 cm) ar 48 in. (121 cm� common tools, such as knives, banders and capacitor <br /> wide, 25 ft. (635 cm)standard tength.The 48 in. discharge guns for appiying insuiation pins. In ordar ta <br /> ` (121 cm)wide blanket heips to minimize waste. install the duct firestap system,the surFaces af all the <br /> *Aluminum foil tape. apenings and penetrating items need to be clsan,dry, <br /> frost free and free of dust. <br /> • Minimum 3/4 in. (19 mm)wide filament tape. <br /> •Stainless stesl banding material, minimum 1/2 in. D. Method (7wa-Layer for ASTM E 2336) <br /> (12,7 mm)wide, minimum 0.015 in. (0,38 mm)thick, Note:These general instructions for installing <br /> with stainiess steel banding clips. 3N1T"' Fire Barrier Duct Wrap 615+ include a two-layer <br /> * Hand banding tensianer, crimping taol and wrap construction of 24-inch 3MT"' Fire Barrier Duet <br /> banding cutter. Wrap 615+hlanket applied directly ta a grease duct. <br /> * Minimum 12 gauge copper-caated steel insulatian Ta minimize waste,3MT"" Fire Barrier Duct Wrap 615+ <br /> pins used with minimum 2-112 in. (38 mm}square material should be roMled out tautly before measuring. <br /> galvanized steel or stainless speed clips or 1-y/2 in. The first layer of 3M Fire Barrier Duct Wrap 615+ <br /> {38 mm)dia. round or equivalent sized insulated b�anket is wrapped around the perimeter of the duct <br /> cup-head pins. and is cut to a length ta averlap itself not less than <br /> 3 in. {76 mm}.The overlap made by adjacent blankets <br /> • Capacitar discharge stud gun. forms the"longitudinal" overlap.Aluminum foil tape is <br /> •Access door hardware:four galvanized stes!thread used to seal all cut edges of the blanket and any tears <br /> rods, 1/4 in. (6 mm) diameter by minimum 6 in. long in the foil scrim.This first layer is temporariiy held in <br /> (152 mm)with 1/4 in. (6 mm)wing nuts and 1/4 in. p�ace us'sng filament tape.The first layer daes nat <br /> (6 mm)washers. require stainless steel banding. <br /> _ , • 4 in. (102 mm) long stesi hollaw tubing to fit The second layer af 3lVlT"' Fire Barrier Duct Wrap 615+ <br /> threaded rods. blanket is wrapped around the perimeter of the <br /> • Minimum 4 pcf(64 kg/m� density mineral waoi ar Previously installed first layer of 615+, and is cut to at <br /> ° scrap pieces af 3MT'" Fire Barrier Duct Wrap 615+. length to overlap itself not less that 3 in. (76 mm).The <br /> centerline of the second layer of blanket should be <br /> • 3MT"' Fire Barrier Water Tight Sealant 1000 NS, 1003 centered aver the overlap of the first layer.The second <br /> SL ar 3MT"'Fire Barr'ser Silicane Seaiant 200Q+. layer of blanket requires longitudina!overlap onto <br /> adjacent blankets of not less than 3 in. (76 mm).The <br /> B.Starage second layer of blanket is also held in place using <br /> filament tape.The second layer af wrap requires <br /> The 3MT"' Fire Rarrier Duct Wrap 615+and 3MT"' Fire p�rmanent fastening with stainless steel banding or <br /> Barrier Water Tight Sealant 1000 NS, 1003 5L or rows of weld pins{impaling ar cup-head style). <br /> 3MT"' Fire Barrier Silicone Sealant 2000+ must be <br /> stored in a dry warehouse environment. Pa(lets <br /> should not be stacked. <br /> 2!n accardance with the talerancas in ASTM C 892 Standard SpecificaYian far High-Temperature Fiber Blanket Thermal Insulation. <br /> � 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.