My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
18-19280
Zephyrhills
>
Building Department
>
Permits
>
2018
>
18-19280
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/21/2018 10:54:45 AM
Creation date
9/21/2018 10:54:43 AM
Metadata
Fields
Template:
Building Department
Company Name
SIVLER OAKS
Building Department - Doc Type
Permit
Permit #
18-19280
Building Department - Name
ROWE,BEULAH
Address
37148 CULLENS TRAIL
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> :: ; <br /> ; <br /> PAUL E. HAGLER, P.E. <br /> Engineering Consultant <br /> "Civil-Structural- Geotechnical Engineering" <br /> 12HO HEATHER RIDGE BLVD FPE 20158 voicE:(727)738-9025 <br /> DUNEDIN,F[,oxiDn 34698 E-tvtniL:pehagler@gmail.com Fn�c.(727)738-9505 <br /> January 17, 2018 <br /> Zephyrhills Building Department <br /> 5335 8th St. <br /> Zephyrhills, FL 33542 <br /> Re: Foundation Stabilization <br /> Rowe Residence <br /> 37148 Cullens Trail <br /> Zephyrhills, FL 33542 <br /> Gentlemen: <br /> The following is information regarding the proposed method of stabilization for the above <br /> referenced project. A portion of the foundation and building wall where settlement has occurred <br /> is to be stabilized and lifted. The wall has settled due to soft underlying soils. We have <br /> determined that underpinning for the structure will stabilize the impacted portion of the wall in <br /> the upper soils. <br /> The proposed method of underpinning is the use of helical piles. These are augured into the <br /> underlying soil until their load supporting capacity of approximately 11 tons is achieved. This <br /> stabilizes the effect of poor upper soil strata and discourages further raveling. The top of the <br /> pile connection system allows for adjustment and lifting of the floor to return the floor as nearly <br /> as possible to its original elevation. Pile spacing has been selected on the basis of anticipated <br /> relative soil density and imposed load from the structure. <br /> It is our engineering opinion that the proposed installation will, when complete, provide <br /> stabilization of the impacted portion of the floor in those areas where the underpinning is <br /> performed. <br /> NOTE: All RamJack helical piles have been certified as meeting ICC-ES, AC358, acceptance <br /> criteria for helical pile systems and devices (Mandatory Compliance Date December 1, 2013). <br /> In compliance with Florida statutes 627.707, this report was prepared under the supervision of a <br /> Registered Professional whose field of expertise is Structural and Geo-Technical Engineering. <br /> Sincerely�����`e,�'!Fd�����/� <br /> �� .��'.---�-.�'� �i� I <br /> `�� �;.-��c��s�,� %� , <br /> . .� � <br /> . � <br /> • ' ; � <br /> _ . . <br /> Paul €�i'agler sr�Te oF ,;��` �� <br /> FPE 2 5 � � <br /> a3 $.'. ,c A,r ? . <br /> %.F`�;�.�oR�o cy�.\�� <br /> cc: AI��J r���6a�$��c��LLC <br /> 9��i�1��������� <br />
The URL can be used to link to this page
Your browser does not support the video tag.