My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
18-19284
Zephyrhills
>
Building Department
>
Permits
>
2018
>
18-19284
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/21/2018 11:19:59 AM
Creation date
9/21/2018 11:19:18 AM
Metadata
Fields
Template:
Building Department
Company Name
EMERALD POINTE RV RESORT
Building Department - Doc Type
Permit
Permit #
18-19284
Building Department - Name
CONLEY,ERNESTINE & DANA
Address
3445 BERYL LN
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
���-�:� <br /> y,a <br /> i v <br /> I . . <br /> 1 <br /> i " . ' <br /> All lot improvernent requests must be submitted no later than iNednesday by 2:00 to be <br /> processed on the following committee meeting day. All permits must be posted visible to the <br /> street. � <br /> Date Recd��-�//�-1 LOT IMPROVEMENT REQUEST Permit No ' 7 / (j �d �. <br /> —f- <br /> D <br /> To: EPPOA Lot Improvement Committee & Board of Directors <br /> From (please print � � ,����q <br /> Lot#/Address:��� b� ���p�� L ����� �������S �T <br /> Phone number where you can be reached'��,(���� .— �'� S� <br /> We request EPPOA approval for construction, addition to our installation, on the <br /> following: <br /> ( ) Shed ( )Lanai ( )RV, Port ( )Park Model ( ) Cottage ( )Concrete Slab ( ) Pavers <br /> ( ) Concrete Painting ( ) RV Skirting ( ) Landscaping ( )other <br /> Al1 requests for construction/additions/remodeling are required to have a complete, <br /> detailed/sketch, to include footprint, setbacks, front elevation, back elevation, left & <br /> right side elevation and top elevation. All elevations must include all sizes and <br /> locations of windows and doors, with length, width and height of the overall structure. <br /> Park models are to include pamphlet with pictures. In addition, all requests require and <br /> must include the full description, including color of siding, trim, shutters, doors, <br /> pavers and concrete painting if applicable. "PRIOR TO BEGINNING CONSTRIICTION" a copy of <br /> the Zephyrhills building permit and a copy of the completed engineering plans must be <br /> RETURNED to the "LOT IMPROVEMENT CONIIdITTEE", these will be returned to you for <br /> construction. Upon completion of your construction a complete copy of the engineering <br /> drawings of the structure, (as built) permits, inspections and final permit approvals <br /> must be returned to the Fhierald Pointa Lot Improvement Committee for Office filing. <br /> ALL REQUESTS MUST COMPLY WITH CURRENT,REQUIRED PERMITS FROM THE CITY OF <br /> ZEPHYRHILLS, PASCO COUNTY, OR STATE OF FLORIDA CURRENT BUILDING CODES. <br /> Comments: <br /> _ < I <br /> �� i <br /> � I <br /> � I <br /> -t <br /> � <br /> �i <br /> Lot Owner's Sig ture Date �v�/ � �� <br /> Page 2 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.