My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
18-19347
Zephyrhills
>
Building Department
>
Permits
>
2018
>
18-19347
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2018 9:31:54 AM
Creation date
9/24/2018 9:31:36 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
18-19347
Building Department - Name
MILLER,GORDON & JOHNSON,LORI
Address
5535 23RD ST
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3920 Watt to 70080 Watt DC Photovoltaic System Electrical Diagram <br /> Solaredge SE 7600A-US Inverter with <br /> OOO One to Two strings of Solarworld SW280 Modules and Solaredge P300 Optimizers <br /> ro verter Optional Supply Side Connection <br /> Nec 7os.12A Maximum 18 modules per <br /> Solarworld 10 string and minimum S modules <br /> �+ SW280 2 0 ������ �1e per string as per Solaredge <br /> N MO Modutes olaredge P300 <br /> #6 6aze copp <br /> cec (a�s s Utllity meter ower Optimizers <br /> 7HHWiHWN-z zoon <br /> \t, 3/4"PVC condu (4)#10 AWG PV wire 2-B,2-R Module power ptimlzer <br /> so A fused 1 <br /> dfsconnect with — (1)#6 88re Copper Factory Facto Cable <br /> 40 A fuses exlstin Maln Dishibution DC leads S018fWOfld SW280 <br /> e����9 Panel Solaredge P300 PowerOptimizer MOduleSpeCs <br /> gyy Max input power:300 Wp-dc Pm87c:280Wp <br /> Zgp #8 Max.input DC Voltage:48 VDC Voc: 39.5 V <br /> 200A Panelboard Max inputcurrent: 12.6A Vmpp:31.2 V <br /> MPPT Ran e:5-48 VDC <br /> with 200A main Maz Output Voltage:60 VDC �mpp9'910�A <br /> breaker Max Output current: 15A <br /> O200A-2 Notes: All work to meet or exceed NEC 2011 <br /> O1O.lunction box to be located within the array boundary. Junction box must be minimum Nema 3R UL listed <br /> 4 enciosure.Free air conductors must be installed in raceway if readily accessible as per 690.31(A). <br /> OO (4)#10 AWG THHN/THWN-2 2Of'he minimum volume of the Nema 3R enclosure for the transition of PV wire to THWN-2 wire shall be <br /> O$ (1)#8 AWG THHN/THWN-2 4Z cubic inches. Heyco 5 wire Masthead gland seals or similar connector are required as strain relief <br /> Nema 3R Z-B�2-R,1-G for PV wire into Nema 3R junction box at array. <br /> O40A/2 � JunCtion 3/4"EMT,FMC(inside structure) Olnterconnection with 40 Amp 2 pole OCPD via 2011 NEC 705.12(D)(2)Load Side Connection. The 40 A <br /> • Box LFNC,PVC(outside structure) backfed breaker must be located at the opposite end of the bus from the 200 A main supply breaker <br /> � 690.31E 4O.'i'he required PV Backfed breaker plus the main breaker rating must be less than or equal to 120%of <br /> ; the Main service bus rating. 705.12(D)(2) <br /> � Solaredge SE7600A-US OOptional Supply Side connection via 705.12A using parallel Iine taps in a NEMA 3R box(as required) <br /> � '� oc Transformerless Inverter with using NSI IPCS4002, Ilsco IPC-KUP-L or NSI Tork IPLD 3/0-3 Multi-Tap Connector or equivalent. <br /> existing � • I,I Q� integrated DC disconnect. OpV service disconnecting means for"optional"supply side connection must have neutral/EGC bond <br /> roundin ��J <br /> g g � � (4)#8 AWG THHN/THWN-2 W�thin and must be listed as"suitable for use as service equipment." 230.66 <br /> electrode � 7�. The fuses in the disconnect for the"supply side"option must be rated to handie the maximum short- <br /> � , � ' 7-B,1-R,1 W,i-G <br /> `� � ; circuit current available at the supply terminals.110.9,110.10 Over-current protection for the supply side <br /> \_;__. ; 3!4"EMT,FMC,LFNC, <br /> U � ' ' or PVC connected conductors shall be located within 10 feet of the connection to the service. 705.31 <br /> � 8O. The following la6el is required on meter can and main panelboard"Service <br /> ' � ` is fed from dual power sources Utility and Photovoltaic system" <br /> � � . _ O. 'PV input Do not relocate this OCPD"label required adjacent to backfed breaker. 705.12(d)(7) <br /> (4)#8 AWG THHNITHWN 2 10 Bonding of module to rail and module to modufe accomplished through WEEB <br /> 7-B,1-R,1-W,1-G washers or self groUnding mid-clamps. <br /> 3/4"EMT,FMC,LFNC,or PVC 11. "Warning:DC conductors of this system are ungrounded and may be energized"requlred on the ' <br /> DC Disconnect 690.35F <br /> 12.."Warning:Photovoltalc Power Source"label required on conduit per 690.31(E)(3)(4) <br /> 13.Total voltage drop%for all circuits based on listed conductors is 1.64%based on: <br /> If required by Utility A.100 foot round trip PV wire open air run to Nema 3R junction box <br /> 60A 240V AC Disconnect with label: 11 B.150 round trip source circuits(THWN-2)to termination in DC disconnect <br /> On-site Utility Generation C.30 feet round trip Inverter Output circuit to point of interconnection. <br /> Disconnect Switch DC Dlsconnect Label D.Conductors should be sized for max 2%voltage drop to decrease possible <br /> Requirements inverter shutdown and production losses due to AC voltage rise at the inverter, <br /> Vmpp 350 vdc <br /> PV AC Disconnect Label Requirements Vmax 500 vdc <br /> Operating Current:32A Fortnula to figure IMPP for DC Disconnect <br /> Impp 11.2 to 23 A(based on ar�ay otal STC DC power rating of array In Watts <br /> Operating Voltage:240V nameplate rating) divided by 3so Vdc equals IMPP in Amps. <br /> Imax 15 or 30 A (1 or 2 strings) ex:3920 watts/350 Vdc=11.2 Am s <br />�— <br />