Laserfiche WebLink
� � � WEINTRAU� <br /> � INSPECTIONS &FORENSIC,INC. <br /> 3868 Sun City Center Blvd. Ph.813-633-8000 <br /> Sun City Center,Fl.33573 Fx.813-464-5026 <br /> CONCRETE SLAB/FDUNDATIDN <br /> INSPECTION REPORT <br /> INSPECTION DATE: OS/03/2018 (�j-- <br /> CLIENT/Community: D.RH-TAMPA/ Silverado <br /> LOT#(s /ADDRESS: # 4/7 / 19372 Silverado Ranch <br /> SUPERINTENDENT: Chris Tallant <br /> WEATHER: 66 sunny <br /> INSPECTION CRITERIA/PROTOCOL <br /> OBSERVED&INSPECTED PASS FAIL <br /> 1. Verify Soil Compaction Report in permit box(if req. by jurisdiction X <br /> 2. Ve�y slab thickness formed is per permitted plans X <br /> 3. Verify exterior wall footing excavation free of debri X <br /> 4. Verify exterior wall footing reinforcing steel size and quantity per plans X <br /> 5 Verify isolated or monolithic footing pad reinforcing steel size and quantity X <br /> are per plans <br /> 6. Verify isolated_or monolithic footing pad locations are per plans X <br /> Verify that all continuous interior monolithic thickened slab foundations are <br /> �' width and depth per plans X <br /> Verify that all continuous interior monolithic thickened slab foundations are <br /> g' correctly located per plans X <br /> 9 Verify slab welded wire reinforcing is gage and grid dimension specified on X <br /> plans <br /> . Verify that all welded wire slab reinforcing is lapped per plans or Code � <br /> 10. referenced standard whichever is greater X <br /> 11 Verify that all welded wire slab reinforcing is properly chaired each way at X <br /> 36"o/c <br /> 12. Verify vapor barrier is per plans for type and millage X <br /> 13. Verify vapor barrier is installed in accordance with manufacturer's X <br /> recommendations <br /> 14. Verify all seams are taped and conduit penetrations taped X <br /> r <br />