Laserfiche WebLink
.. � pagc f <br /> ' OLNER TECHHOI,OGIES,INC. revisian 6/07 <br /> FLQRIDA tNSTALtATiON(NSTRUCTiONS FORTHE <br /> MODEt,1101"V"SERIES��,L STEEL�QSJNDATIOPt SYSTEM <br /> MOOEL 1101"V"(STEi�S 1-1� <br /> LONGf7'tlD1NAL�NLY:FOL�OW STEPS 1-9 <br /> fOR ADDWG LATERA4 ARlN:Folfow S2eps�0-15 <br /> FQR CONGRETE APPLICATIONS:Fo!!ow Steps 46-19 <br /> ENGINEERS STqMP ENGiNEERS S7qMP <br /> 4.SPECIA�ClRCUNfSTANCES: if the foltowing coaditians occur-STOPI Contact Ofiver Technologies at 1-800-284-7437: <br /> a)Pier height exceeds 48" b) Length of home exceeds 76'c)Roof eaves exceed 46"d}Sidewall height exceed 96" <br /> e)Location is within 1500 feet of coast <br /> IN�TALLATfON_OE GROUND PAN <br /> 2.Remove weeds and debris in an approximate iwo foot square to expase firm soil for each ground pan(C}. <br /> 3_Place ground pan (C}directly below chassis t-beam. Press or drive pan firmiy inio soi[until fiush with or below soil. <br /> SPECIAL NOTE:7he fongitudinaf"V"brace system serves as a pier under the home and should be loaded as any <br /> other pier.lt is recommended that after leveting piers,and onafhird inch('1/3")before fiome is lowered completely on <br /> to piers,complete sieps 4 through 9 below then remove jacks. <br /> J�STALlA71n;�QF t�ONGITUDIHAL"V"BgACE SYSTEM <br /> NOTE: WHEN 1NSTAlLlN�THE LONGI7UDlNAL SYS7'EMQy�,3; A MINIMUM OF 2 SYSTEMS PE12 FLOOR SEC7fON IS REQUIRED.SOI�.TES7 <br /> PROBE SHOULD 8E USED TQ bETEftMiNE CORRECT 7YPE OF ANCHOR PER SOfL CLASSIF3CAT[Ot�f.IF PR06E TEST READINGS ARE SETWEEN <br /> 175&275 A 5 FOOT ANCH�R MUST BE USEp.1F PROBE TEST READiNGS ARE BEiWEFN 276&350 A 4 FOOTANCHOR MAY BE U3�D.USE <br /> GROUND ANCHORS VYffH DfAGONAI.'F1E3 AND STABILIZER PLATES ENERY 5`4".VERTICAL 71ES ARE A154 REQUIREET ON FIOMES SUPPLI&Q <br /> WITH VERTICAL TIE CONNECTION POINTS{PER FLORI�A REG�). <br /> 4.Se(ect the correct square tube btace(E)Iength for set-up(pier)height ai support location.(The 18"tube is always <br /> used as the botfom pad of the longitudinat arm). Note:Either fu6e cart be used by itself, cut and drilled to length as long as a <br /> 40 to 45 degree angle is mairttained. <br /> PIER HElGH7 1.25"ADJUSTABLE 1_50'ADJUS7ABLE <br /> (Approx.45 degrees Nlax.} Tube Length Tube Length <br /> 7 3!4"to 25" 22" 18" <br /> 24 3/�"to 32 1/4" 32" 18" <br /> 33"to 41' q�4" 18" <br /> 40"to 48" 54" 1 g" <br /> 5, tnstall(2)of the 1.50"square tubes(E {98"tube})into the"U"bracket(J),insert caniage bo(t and leave nut loose for fnai <br /> adjustment. <br /> 6. F'lace t-beam connector(F)tooseiy on the bottom flange of the i-beam. <br /> 7. S1ide the selected i.25"tube(E)into a 1.50"t�be(E)and attach to I-beam conneciors(F)and fasten loosefy with bolt and nut. <br /> S. Repeat steps 6 through 7 to create the"V"pattern of the square tubes loosely irt place.The angfe is not to exceed 45 <br /> degree and not below 40 degrees. <br /> 9.After all bolts are tightened,secufe 1.25"and 9.50"tubes using four(4)1/4"-'E4 x 3/4"self-tapping screws in pre-drilled hofes. <br /> IN�^�7ALLa714N�F LATEFtA�T�{�,��OP[NG TRANSYERSE ARM SYSTEM <br /> THE AlODEL 1�Oi'N"(LONGITUDtNAL 8 LA'fERAI Pt24TECTfON)ELIMINATFSTHE NEED FOR HlOST STA8IL�ZER PLA7E5��RAME TIES. <br /> NOT�:THE ISSE OF 7HIS SYSTEM REQUIRES VER7ICAL 71ES SPACED A�S4", <br /> FOF1f2 F00T{4')GROUND ANCHOR MAY 8E USED EXCEPT WkERE 7NE HOME MANiJFACTURER SPEC[FIES DIFFERENT. <br /> 30.Instal!remaining vertica!tie-down straps and 4'ground anchors per bome manufacturer's instructions.No7E:Centerline <br /> anchors ta be sized according to soil torque conditian.Any manufacturer's specificatinns for sidewalf anchor loads in excess of <br /> 4,000 ibs.requ+re a 5'anchor per Florida Code. <br /> 19.No7E:Each sysiem is required to have a frame tie and shabifizer attached at each lateraf arm stabifizing locafion.This frame tie& <br /> stabilizer plate needs to be(ocated within'f 8"from of center ground pan. <br /> 12.Seiect the correct square tube brace(H)length for sei-up Iateral transverse ai suppori tocation.The lengths come in either 60" <br /> or 72'lengihs.(With the 4.50"fube as the bottarr�tube,and the 125"tube as the inserted tube.) <br /> '13.lnstall the 9.50 transverse brace(H)fo the ground pan connector(D)with troit and nu� <br /> 14.Slide 1.25"transverse brace into the 9.b�"brace and at#ach to adjacent 1-beam connector(])with trolf anci nut. <br /> 15.Secure 1_50'transverse arm to 9.25"transverse arm usina four(4)9/4"-14 x 3/4"self-tapainc,�screws in re-drilied holes. <br /> Q���/ER T�Cf{ND�OGI�S,�PlC. Te3ephone_939-796-4555 <br /> 4-800-284-7437 Fax:931-796-8819 <br /> www.ofrvertechnof og ies,com <br /> . �/ <br /> I <br />