My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
18-19394
Zephyrhills
>
Building Department
>
Permits
>
2018
>
18-19394
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2018 11:04:12 AM
Creation date
9/24/2018 11:04:06 AM
Metadata
Fields
Template:
Building Department
Company Name
LINCOLN HEIGHTS
Building Department - Doc Type
Permit
Permit #
18-19394
Building Department - Name
DAFFRON,ELIZABETH
Address
39418 KENNEDY AVE
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PGT Industries,Inc. � ' <br /> NOTICE OF ACCEPTANCE: EVIDENCE SUBMITTED <br /> A. DRAV6rINGS <br /> 1. Manufacturer's die draw�;ngs and sections. <br /> (Submitted under NDA No. 10-0819.OS� <br /> 2. Drawing No. 6300JR, ti�led "Impact-Resistant Aluminum Tube Mullions", sheets 1 <br />� through 25 of 25, dated 08/29/11, with revision C dated 06/19/17, prepared by <br /> manufacturer, signed and sealed by Anthony Lynn Miller,P.E. <br /> B. TESTS <br /> 1.. Test reports on: 1)Air Infiltration Test,per FBC,TAS 202-94 <br /> 2}Uniforzn Static Air Pressure Test,Loading per FBC, TAS 202-94 <br /> 3)Watar Resistance Test,per FBC, TAS 202-94 <br /> 4)Large Missile Impact Test per FBC, TAS 201-94 <br /> 5) Cyclic Wind Pressure Loading per FBC,TAS 203-94 <br /> 6�Forced Entry Test,per FBC 24113.2.1, and TAS 202-94 <br /> alang with marked-up drawings and installation diagram of clipped aluminum <br /> mullions, prepared by Fenestration Testing Lab, Inc., Test Report No. FTL-6443 <br /> (samples A-1 thru E-1), dated 02/28/11, anc3 addendum letter dated �5/OS/11, signed <br /> and sealed by Marlin D. Srinson,P.E. <br /> {Srabmitted under NOA No. 10-0819.05� <br /> C. CALCULATIONS <br /> i. Anchor verification calculations and structural analysis, complying with FBC 5th <br /> Edition (2014) and with FBC 6tb Edifion (201�, prepared by manufacturer, dated <br /> � 08/29/17, signed and sealed by Anthony Lynn Miller,P.E. <br /> D. QUALITY ASSURANCE <br /> l.. Miami-Dade Department of Regulatory and Economic Resources{RER). <br /> .. E. MA.TERIAL CERTIFICATIONS <br /> 1. None. <br /> �� � <br /> Jorge M.Plasencia,P.E. <br /> �ro uct Control Unit Supervisor <br /> NOA No.17-0630.01 <br /> Expiratioa Date: May 26,202] <br /> Approval Date: November 09,2017 <br /> E-1 <br />� <br />
The URL can be used to link to this page
Your browser does not support the video tag.