My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
17-18525
Zephyrhills
>
Building Department
>
Permits
>
2017
>
17-18525
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2020 1:23:21 PM
Creation date
1/31/2019 8:35:47 AM
Metadata
Fields
Template:
Building Department
Company Name
ARCHWAY PROPERTIES LLC
Building Department - Doc Type
Permit
Permit #
17-18525
Building Department - Name
ARCHWAY PROPERTIES LLC
Address
5526 12TH ST
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2017 Florida:.Building. Code -:Finer Colnse'rvatioln;:Sixth Edition <br /> JY :: <br /> .:.R402AA: 2Testing.:.. : - <br /> The building:or dwelling-unit shall be tested and verified as having an air leakage rate not exceeding <br /> .seven air changes per hour in.Climate Zones.1.and 2,and three air..changes per hour in Climate Zones:= <br /> 3 through.8.Testing shall'be conducted.in accordance with ANSURESNETACC.380 an6re0ortod at.a <br /> pressure.of 0.2 'inch w: 50., ascals . Test .shall be.conducted b .either individuals as defined in <br /> 9 ( P ) 9 . Y . <br /> Section553.993(5)'or(7),Florida Statutes,-or individuals licensed as setforth in'Section 480A 05(3)(f); <br /> (g) or_(i) or ari approved third party. -A written;report of the results of the-test shall:be signed.by the: <br /> party conducting the test and-provided to.the.cod&official.Testing shall.:be.performed at any time:after <br /> creation of all penetrations of.the building thermal envelope: :. - <br /> Exception: Testing is.'not required..for..additions;-alterations,:renovations or repairs:-of the. building <br /> thermal:envelope of:existing buiIdirigs in which the new:consteuction is less than 85:percent of.the <br /> building thermal:envelope- <br /> During <br /> . :. . <br /> During testing: - <br /> 1: I.Exterior.windows and-doors, fireplace and stove-doors shall be:closed, but not sealed, beyond <br /> the intended weatherstripping:or other infiltration.control measures: <br /> ..2. :2:Dampers'including exhaust, intake, makeup air, backdraft and flue dampers shall be closed, but' ; <br /> not sealed beyond-intended infiltration.control measures.: <br /> 3. 3.Interi6r doors, if installed at the time dthe test-, shall be'open: <br /> 4: .4.Exterior doors for continuous ventilation.systems and heat recovery..ventilators shall be closed <br /> and sealed.. .: : . . <br /> 5.. 5.Heating and'cooling-systems, if installed.atthe.time:ofthe test; shall be turned-off. <br /> 6: 6.Supply and return registers;.if installed at the time of the test, shall.be fully open.. <br />
The URL can be used to link to this page
Your browser does not support the video tag.