My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
18-19163
Zephyrhills
>
Building Department
>
Permits
>
2018
>
18-19163
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2019 8:49:26 AM
Creation date
1/31/2019 8:49:24 AM
Metadata
Fields
Template:
Building Department
Company Name
K & R HOME RENTALS LLC
Building Department - Doc Type
Permit
Permit #
18-19163
Building Department - Name
K & R HOME RENTALS LLC
Address
5435 10TH ST HISTORIC
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Invoice <br /> Guadarranna & Sons LLC <br /> 7051 Glory Rd <br /> Zephyrhills FI 33540 <br /> Melinda Velasquez <br /> K&R Home Rentals LLC <br /> 5435 1 Oth Street <br /> Zephyrhills FI 33542 <br /> 813-263-2654 <br /> Customer ID 0913 <br /> Scope of Work Payment Terms Due Date <br /> Remove 2nd FI floor joists,etc. Rene/Framer Mgr _ As discussed below _ Upon Completion_ J —j <br /> Qty Description Unit Price Line Total <br /> l.Build temporary walls to support roof load to allow removal of <br /> approximately 40 second story floor joists. <br /> I � <br /> 2.New floor joists to be installed with proper metal hangers where <br /> I they meet. i I <br /> I I <br /> 3.Remaining flooring on the second floor to be removed and new ! <br /> 4X8 tongue and grove flooring to be installed. <br /> I <br /> 4.Replace all damaged sill plates and ensure that all double sill <br /> plates are installed up to code. <br /> 5.Removal of a portion of the wall near the kitchen add header as <br /> well as new header at the entry door. { <br /> 6.Frame out secondary entry way for a window to match existing II <br /> window. <br /> i <br /> 7.Add additional floor boards as needed for the lei floor to finish i I <br /> flooring. <br /> i <br /> B.Replace main support across the second story at the front portion <br /> of the home 2x8x16. I <br /> 9.Remove metal basin at second floor. I <br /> I <br /> 10.Add headers to all window openings. <br /> 10.All wood materials to be provided by owner. <br /> ■■rrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrr■ i <br /> Labor costs$10,000 payable 1/3 at start of process,1/3 at half <br /> balance when co pleted. <br /> I <br /> Signatur —ate <br /> I— -— - -- -- - - <br />
The URL can be used to link to this page
Your browser does not support the video tag.