Laserfiche WebLink
Sin e F ami Dwellin <br /> g Y . g _ <br /> Pl <br /> an Review_Comments: <br /> 1. F.F.E. shall be a minimum of.8" above,the road.elevation:and an engineered site plan. . <br /> 2. Lots shall-be'graded.to.comply with R401.3 of the F.B:C: .. <br /> 3._ :Compactionwest required-.if24" or more:of fill dirt is brought in:at any one place: . <br /> 4:. :Tie in survey required before pouring concrete.. <br /> 5. Driveways:require a R.O.:W.use per_mit.: All 4:sides of driveway.thru the sidewalk shall-have. <br /> expansion material. <br /> 6.. All setbacks shall be.met.: <br /> .7. ,All property:markers shall be.uncovered and marked at time of first.inspection: <br /> K.-All A.D.A.-requirements.shall be met. <br /> 9. Na electric-plumbirg, mechanical;,or framirig shall be covered without an:inspection and <br /> approval first. : . <br /> 10. All:Garages shall.comply:.with:section R302;6:of the F.B:C. (Fire Separation). <br /> 11.Appliances:shall not:bei installed in a location where subject to:nie'chftnical'damage unless. <br /> protected by approved barriers. M303.4 of.the F.B:C <br /> .12. Water-heaters shall comply with sectionT6.07.3 of the EB.C: <br /> 13. Foundation supports for A/C units shall be raised at least 3" above finished grade. M1308.1 <br /> 14. Return air in all:bedrooms.:F.B.C. .M.1620A.. <br /> 15. Smoke detecfors are.to be installed:in accordance with:R313.1-of the:F.B.C. <br /> 16. A11 glazing requirements are:.to be in.accordance'with R308.4.of the F.B.C. . <br /> 17. All means.of egress are to.be in:accordance with R311:of the F:B.G. :: : . <br /> 18. `.`Green gypsum board" shall not be used:as.a backer in showers or tubs.'R702.4:2.F.B.C. <br /> 19. Combination-type AFCI breakers are-required at all locations requiring an AFCI,type breaker. <br /> 20' Carbon monoxide,alarms will.be required in'riew:construction that uses fossil-burning' heating <br /> :or app.fiances or an attached garage... They shall be installed in accordance with,the F.B.C.. <br /> . <br /> 21. All plumbing;mechanical, and electrical shall:be separate from unit_to.unit. This includes all <br /> underground plumbing and electric. <br /> 22. All 2008 N.E.'C:. Codeswill be enforced. <br /> 23:Tam er- Resistant p Receptacles in.accordance with 406.11 of the 2008 N:E:C <br /> .24-An accordance.with the Land:.Development.Code;_lots.shall be so' before final at least 10_ . <br /> feeYaround the structure: <br /> 25.'A.copy of tlae energy cacls shall be with permit at all tifttes. <br /> 26..Copy of final insulation report shall be.provided with.pMuit-befot e.final <br /> F.F.E.-Finished Floor Elevation <br /> F.B.0 Florida Building Code P Edition <br /> R.O.W.-Right of Way . <br /> A.D.A:-Americans with Disabilities Act N.E.C.-National Electric.Code (2008): <br />