Laserfiche WebLink
' <br /> ' <br /> ' FORMR4O5-2D14 ' <br /> BusinessFlorida Department of d Professional Regulations <br /> Residential Whole Building Performance and Prescriptive Methods <br /> ADDRESS: Permit Number: <br /> MANDATORY REQUIREMENTS See individual code sections for full details. <br /> [� 401.3 Energy Performance Level(s 4dis my card(Mandatory). The building official shall require thatperformance levo|(EP4 <br /> display card be'completed and certified by the builder to be accurate and correct before final approval of the building for occupancy.Florida law <br /> [Section 553.9085, Florida Statues]requires the EPL display card to be included as an addendum to each sales contract for both presold and <br /> nonpresold residential buildings.The EPL display card contains information indicating the energy performance level and efficiencies of components <br /> installed in a dwelling unit.The building official shall verify that the EPL display card completed and signed by the builder accurately reflects the plans <br /> andspecifications submitted to demonstrate compliance - .' of the EPL display ` .end <br /> O B4ou.4 Air leakage yNandamqA. The building thermal envelope shall be constructed to limit air leakage in accordance with the requirements of <br /> aectionvR4ue.1 NmughRwuc�.^. <br /> O R402.41 Building thermal envelope. The building thermal envelope shall comply with Sections R^oo.4.1J and R4Oe,�1.2.The <br /> sealing methods between dissimilar materials shall allow for differential expansion and contraction. <br /> ^ R402�.11Inota|bbun The components of the building thermal envelope ca listed in Table n4o2.41.1 shall bo installed in <br /> accordance with the manufacturer's instructions and the criteria listed in Table 402.4.1.1,as applicable to the method of construction. <br /> Where required uy the code uffioo|,on approved third party shall inspect all components and verify compliance. <br /> ^ R402.4.1.2Toyung. The building or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding 5 air <br /> changes per hour in Climate Zones 1 and 2,and 3 air changes per hour in Climate Zones 3 through 8.Testing shall be conducted with <br /> ab|mwoi.dou,at a pressure of 0.2 inches w.g.(50 Pascals).Where required by the code official,testing shall be conducted by an <br /> approvedthird party.A written report of the results of the test shall be signed by the party conducting the test and provided to the code <br /> official,Testing shall bo performed au any time after creation of all penetrations of the building thermal envelope. <br /> During testing: <br /> 1.Exterior windows and doors,fireplace and stove doors shall be closed,but not sealed,beyond the intended weatherstripping or <br /> other infiltration control measures; <br /> 2.Dampers including exhaust,intake,makeup air,backdraft and flue dampers shall be closed,but not sealed beyond intended <br /> infiltration control measures; <br /> a.Interior doors,if installed at the time m the test,shall uoopen; <br /> 4,Exterior doors for continuous ventilation systems and heat recovery ventilators shall be closed and sealed; <br /> 5.Heating and cooling systems,if installed at the time of the test,shall be turned off;and <br /> s.Supply and return registers,if installed at the time of the test,shall bo fully open. <br /> {} R402.4.2 Fireplaces.New wood-burning fireplaces shall have tight-fitting flue dampers and outdoor combustion air, <br /> O R402.4.3 Fenestration air leakage.Windows,skylights and sliding glass doors shall have an air infiltration rate of no more than 0.3 cfm <br /> per square foot(1.5 Uslm2),and swinging doors no more than 0.5 cfm per square foot(2.6 Uslm2),when tested according to NFRC 400 or <br /> AAMA/WDMA/CSA 1 Ol/I.S.2/A440 by an accredited,independent laboratory and listed and labeled by the manufacturer. <br /> Exception: Site-built windnwm.eky|ights and doors. <br /> O R4ou.4.0 Recessed fighting. Recessed luminaires installed in the building thermal envelope shall be sealed to limit leakage <br /> bm=eancondiUonadand unoondihunadspaces.All mvonaod|uminaimashoUbo|C'nmad and labeled ao having on air|eakaworate not <br /> ' more than 2.0 cfm(0.944 Us)when tested in accordance with ASTIVI E 283 at a 1.57 psf(75 Pa)pressure differential.All recessed <br /> luminaires shall be sealed with s gasket pr caulk between the housing and the interior wall p,ceiling covering. <br /> u Rouu1.1 Thermostat provision yMmnuuton0. At least one thermostat shall be provided for each separate heating and cooling system. <br /> O R403.1.3Mea pump supplementary heat(Mandatory). Heat pumps having supplementary electric-resistance heat shall have controls <br /> that,except during defrost,prevent supplemental heat operation when the heat pump compressor can meet the heating load. <br /> �] R403.2.2 Sealing(Mandatory)AII ducts,air handlers,and filter boxes and building cavities that form the primaryairuonxainmem <br /> passageways for air distribution systems shall be considered ducts and plenum chambers,shall be constructed and sealed in accordance <br /> with Section C403.2.7.2 of the Commercial Provisions of this code and shall be shown to meet duct tightness criteria by post-construction <br /> nr rough-in testing below. <br /> Duct tightness shall be verified uy testing mGocnonmmmtheREGNETStanuordu by either an energy rater certified in accordance with Section <br /> 553.99,Florida Statutes,or as authorized by Florida Statutes,to be"substantially leak free"by either uf the following: <br /> 1 Post-construction test:Total leakage shall ua less menn,aqu��4chn(11oUmin)per 1oouquamfe�(o.eomu)�oundihoned floor area <br /> when� �� dauupmanum di <br /> fferential inches vxg.(25 Pa)across the entire system,including the manufacturer's air handler enclosure.All <br /> register boots shall bm taped or otherwise sealed during the test. <br /> 2. Rough-in test:Total leakage shall bo less than m equal Umin)per 100 square feet(9,29 m2)of conditioned floor area when tested <br /> aua pressure differential n|u.1 inches vxo.(2sPo)across the system,including the manufacturer's air handler enclosure.All registers shall be <br /> taped or otherwise sealed during the test.If the air hapdler is not installed at the time of the test,total leakage shall be less than or equal to 3 cfm <br /> (8sLmin)per 1oo square feet(o.29ms)v[conditioned floor area. <br /> Exceptions: <br /> 1. The total leakage test is not required for ducts and air handlers located entirely within the building envelope. <br /> o. Duct testing is not mandatory for buildings complying uy Section R4usof this code. <br /> 11/11/20171o0PIVI Enorgyoauge@ USA-RaRoson1* -Section R400.4.1Com Page 1vf3 ` <br />