My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
18-19482
Zephyrhills
>
Building Department
>
Permits
>
2018
>
18-19482
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2020 1:24:32 PM
Creation date
1/31/2019 9:58:23 AM
Metadata
Fields
Template:
Building Department
Company Name
NESTLE WATERS NA INC
Building Department - Doc Type
Permit
Permit #
18-19482
Building Department - Name
NESTLE WATERS NA INC
Address
4330 20TH ST
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 VA. <br /> ENGMEERIN113 AND Special Inspections <br /> ENVIRONMENTAL <br /> 4524 Oak Fail Blvd,Suite 200 Daily Report <br /> Tampa,Florida 33610 <br /> 813.623,3100 mnmw sanova.corn 813.623.3545 <br /> Project: Nestle Waters North America NOVA lob Number: 10106-1018007,000 <br /> Client: Haskell Date of Report: 7.19.2018 <br /> Contractor: R&D Erectors NOVA Representative: Barry Lafon <br /> .Engineer: Sawn Wilkerson Architect: <br /> Plans: 3.23.2018 <br /> At the request of the client,the.undersigned visited the project site on the above date and conducted a number of special <br /> inspections and observations of the contractor's work in progress. The observations were performed in general accordance with <br /> the requirements of Section 553,79,Florida Statutes,Permits;applications;issuance,•inspections. The observations employ visual <br /> observation techniques of the work to verify general compliance with the requirements of the project plans and specifications: <br /> This report is a follow up to the report dated 7.19.2018.The discrepancy noted below has been corrected.This was <br /> observed on site visit on 10.18,2018. <br /> RESOLVED DISCREPANCIES <br /> 1) Attach bridging to existing bar joist after the temporary wall is removed.Approved <br /> A final steel inspection was performed on the new addition.The bar joist,bridging,field welds,roof deck and attachments. <br /> have been completed and meet the requirements of contract drawings and specifications. <br /> The work observed today appears to have been installed.in general accordance with details of site.project plans and <br /> specifications. The field welds appeared to be in general compliance with quality standard requirements of AWS D 1.1 visual <br /> acceptance criteria and the contract documents UNLESS NOTED ABOVE. <br /> i <br /> Signed: 6o/1-/ov,C/_ �-� <br /> ��/ <br /> '��> <br /> Barry Lafon BN4947/CWI/ICC <br /> Statements in this field report are subject to NOVA's principal review, <br /> Page 1 of 1 <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.