My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
18-19482
Zephyrhills
>
Building Department
>
Permits
>
2018
>
18-19482
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2020 1:24:32 PM
Creation date
1/31/2019 9:58:23 AM
Metadata
Fields
Template:
Building Department
Company Name
NESTLE WATERS NA INC
Building Department - Doc Type
Permit
Permit #
18-19482
Building Department - Name
NESTLE WATERS NA INC
Address
4330 20TH ST
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Inspection Report Repo-Steel <br /> WIR-000010 <br /> Welding p p , :steel Reports 1=5 <br /> N OVA <br /> Report Date: 11/16/2018 <br /> PROFESSIONAL I PRACTICAL I PROVEN ' <br /> Tampa Client: Project: <br /> 4524 Oak Fair Boulevard <br /> Suite 200 Haskell 10106A 018007.000 <br /> Tampa,,FL W616. PO Box 45275(11.1 Riverside Avenue) Nestle Waters North America Ze.phyrhills <br /> Phone:813.623:3100 Jacksonville,,FL32232 Expansion <br /> Fax:813.623.3545 4330 20th St. <br /> Zephyrhills,Florida.33542- <br /> The following is.a reference list of welding parameters yelated as.required by Secion 3,5,&6 of AWS D1:1. Yes I No <br /> Joint preparation and fit=uP was observed at suitable intervals:,(6.5.4), Not'Applicable, . <br /> Are surfaces on which welding is to be performed, free of foreign material (scale, rust, moisture, g(ease)?(5.15) Yes <br /> (5.30:1). <br /> Is welding being performed under proper atmospheric conditions?(5.12.2) Yes Is.contractor in compliance with,pre-heat and/or post-heat requirement?(Table 3.2). Not Applicable. . <br /> List of names of welders on project this date: reviewed on site <br /> Remarks: <br /> Arrived on site to observe the placement of the roof deck and attachments at line 5-6/AA-A and 4-5/A-A.5.The area.was approved. Nova <br /> reviewed erectors welder certifications and verified on site welders. <br /> Date:07/13/2018 Prepared by: Lafon, Barry . <br /> No observations,tests, inspections or approvals by NOVA shall relieve the Contractor from his obligation to perform the Work in-strict <br /> conformity with'the Contract Documents, NOVA's inspections and/or tests reported.herein are in no,way a guarantee of deficient-free <br /> construction.The information provided herein.is intended for the sole and exclusive use of our Client unless other.written <br /> agreement is entered into by NOVA and other parties:All other recipients are provided this document and any corresponding tests <br /> and/or inspection results for information purposes only,and any use of said information shall-be at their sole'risk.- <br /> Phase: Structural Steel Inspections <br /> Location: Building Exterior-Roof Contractor: R&D-Erectors . <br /> j. <br /> i <br /> The following is.a-reference list of welding.parameters related as required by Secion 3;5,&6 of AWS D1.1. Yes 1:No <br /> Are contract.documents outlining specific'job re,qu'irements.in place?(6.1,2.1.) Yes <br /> i <br /> Are drawings provided,showing size, len th; type, and location of welds? 6.1.6 Yes <br /> 9 P .. . . 9.. . . 9 .. yp .. ( ) <br /> Are weld and.base material certifications available?(6.2) Not Applicable. <br /> Are qualified.Welding Procedure Specifications in place?(6.3.1) _ Yes <br /> Are all.Welder Certification Records current and in place?(6.5:7) Yes <br /> Does welding equipment comply.w'ith requirements?(6,3.2) Yes <br /> Joint preparationi and fit-up was.observed at suitable intervals. (6.5A4 Not Applicable <br /> Are surfaces on which welding is to be performed, free of foreign material (scale, rust; moisture, grease)?(5:15) Yes <br /> (5:30.1) <br /> Is welding being performed under proper atmospheric conditions?(5.12.2) Yes <br /> Is contractor in compliance with pre-heat and/or post-heat requirement?(Table 3.2) Not Applicable .I <br /> List of names of welders on project this date: on site <br /> STATEMENTS IN THIS FIELD REPORT ARE SUBJECT TO NOVA'S PRINCIPAL REVIEW Page 2 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.