Laserfiche WebLink
WeldingInspection Report Report#:WIR-000010 1: . <br /> N OVA <br /> P p steel Reports -5 <br /> Report Date: 11/16/2018 <br /> PROFESSIONAL I PRACTICAL I PROVEN <br /> Tampa. Client: Project: <br /> 4524 Oak Fair Boulevard <br /> Suite 200 Haskell . 10106-1018007.000 <br /> Tampa,FL 33610 PO Box 45275(11.1 Riverside Avenue) Nestle.Waters North America Zephyrhills <br /> Phone:813.623.3100 Jacksonville,FL 32232 Expansion <br /> Fax:813.623.3545 4330 20th St. <br /> Zephyrhilis,Florida 33542 <br /> The following is a reference list of•welding parameters related as required by-Secion 3,5,&6 of AWS D1,.1. Yes I No <br /> Joint preparation and fit=up was observed at,suitable intervals.,(6.5.4), Not Applicable• . <br /> Are surfaces on which welding is to be performed, free of foreign material (scale, rust, moisture, grease)?(5.15) Yes <br /> (5:30:1) <br /> Is welding being performed under proper atmospheric conditions?(5.12.2) Yes, <br /> Is contractor in compliance with pre-heat and/or post-heat requirement?(Table 3.2)_ Not Applicable . <br /> List of names of welders on project this date: reviewed on site <br /> Remarks: <br /> Arrived on site.to observe.the placement of the roof deck and.attaichments at line 5-6/AA-A and 4-5/A-A.5. The area.was approved: Nova, <br /> reviewed erectors welder certifications and verified on site welders. <br /> Date:07/13/2018 Prepared by: Lafon, Barry <br /> No observations,tests-,inspections or approvals by NOVA shall relieve the Contractor from his obligation to perform the Work in strict <br /> conformity with the Contract Documents.NOVA's inspections and/or tests.reported.herein are in noway a guarantee-of deficient-free <br /> construction.The.information provided herein is intended for-the sole and exclusive use of our Client unless.other:written <br /> agreement is entered into by NOVA and other parties:All other recipients are provided this document and any corresponding tests <br /> and/or.inspection results for information purposes only,and.any use of said information shall beat their sole risk. <br /> Phase: Structural Steel Inspections <br /> Location: Building Exterior-Roof Contractor: R&D Erectors <br /> The following is a reference list of welding parameters related as required by Secion 3;5,&6 of AWS D1.1. Yes[No <br /> Aee contract.docurrients:outlining specific job requ'rrements.in place?(6.1.2.1). Yes <br /> Are drawings provided,showing size, length;type, and location of.weld.0(6.1.6) Yes. <br /> Are weld and,base material certifications available?.(6.2) Not Applicable <br /> Are qualified,Welding Procedure Specifications in place?(6.3.1) Yes <br /> Are all Welder Certification Records.current and in place?(6.5.7) Yes <br /> Does welding equipment comply with requirements?•(6,3.2) Yes . <br /> Joint preparation and fit-up was observed at suitable intervals. (6.5.4) Not Applicable <br /> Are surfaces on which welding is to,be performed, free of foreign material (scale;rust;moisture,grease)?(5:15) Yes <br /> (5.30.1).. <br /> Is welding being performed under proper atmospheric conditions? (5.1.2.2) Yes <br /> I. <br /> Is contractor in compliance with pre-heat and/or post=heat requirement?(Table 3.2) Not Applicable . <br /> List of names of welders on project this date: on.site <br /> i <br /> STATEMENTS IN THIS FIELD REPORT ARE SUBJECT TO NOVA'S PRINCIPAL REVIEW Page 2.of 6 <br /> i <br />