Welding Inspection Report Report#! WIR-000010, <br /> Steel Reports 1-5 <br /> N OVA Report Date: 1,1/16/2018 <br /> PROFESSIONAL I PRACTICAL I PROVEN <br /> Tampa Client: Project: <br /> 4524 Oak Fair Boulevard <br /> Suite 200 Haskell 10106=1018007.000 <br /> Tampa,FL 33610 PO Box 45275(11.1 Riverside Avenue) Nestle Waters North America Zephyrhills <br /> Phone:813.623:3100 Jacksonville,FL 32232 Expansion <br /> Fax:813.623.3545 4330 20ih St. <br /> Ze-phyrhills,Florida 33542 <br /> Images Comments <br /> Arrived on site to observe the placement of the roof deck and <br /> attachments at line 3-4/A-A.5. See discrepancies below. <br /> Reviewed erectors welder certifications and verified.on site <br /> welders. RESOLVED DISCREPANCIES <br /> 1) Install joist bridging and attach to panel at line A-A.5/3=4. <br /> See report dated 7.17.18 <br /> 2) Install correct size bolts and tighten at line 4/A.5: See report <br /> dated 7.17.18 <br /> 3) Install stiffener at 8x8 joist seat per RFI at line 3/A-A.5.See <br /> report dated 7.17.18 <br /> 4) Install tilt-up.panel to panel connection per.C1/S-531 and <br /> B)/S-531. See report dated 7.17.18 UNRESOLVED <br /> DISCREPANCIES <br /> 1) Attach bridging to-existing bar joist after the temporary wall <br /> is removed. <br /> 2). Reference to Engineer sketch for repair at line A/3, detail <br /> show 8-3/4"' anchors, in.the field there are 6. SEOR(Structural <br /> Engineer of Record) needs to verify if this is.acceptable.Also,the <br /> same detail shows,a 5x3 angle.bolted to the beam web and, <br /> Welded to the embed. Please verify if this is required. <br /> 3) Reference to Engineering sketch for the joist bearing seats <br /> at line 3/A=A.5. SEOR needs.to verify the size of the HIT-Z anchor <br /> that is required. <br /> Phase: Structural Steel Inspections <br /> Location: Building Exterior-Roof Contractor: R&D Erectors <br /> The following.is a reference list of welding parameters related as required by Secion 3,5,&6 of AWS D1.1. Yes'/.No <br /> Are contract documents outlining specificjob requirements in place?(6.1.2.1) Yes <br /> Are,drawings provided.showing size, length, type, and location of welds? (6.1.6) Yes <br /> Are weld and base material certifications available? (6.2) Not Applicable <br /> Are qualified Welding Procedure Specifications in place?(6.3.1) Yes <br /> Are all Welder Certification Records current and in place?(6.5.7) Yes <br /> Does welding equipment comply with requirements.?(6.3.2) Yes <br /> Joint preparation and fit-up was observed at suitable intervals. (6.5.4) Not Applicable <br /> Are surfaces on which welding is to be performed, free of foreign material (scale, rust, moisture, grease)?(5.15) Yes <br /> (5.30:1) <br /> Is welding being performed under proper atmospheric conditions? (5.12.2) Yes <br /> Is contractor in compliance with pre-heat and/or post-heat requirement?(Table 3.2) Not Applicable i <br /> List of names of welders on project this date: on site <br /> Remarks: <br /> STATEMENTS IN THIS FIELD REPORT ARE SUBJECT TO NOVA'S PRINCIPAL-REVIEW Page 5 of ii <br />