Laserfiche WebLink
ZEPHYRHILLS FIRE DEPARTMENT <br /> 38410 6th Ave Zephyrhills,FL 33542,_ <br /> FIRE SERVICE USER FEES increase_1/1/2018 <br /> Occupancy No.: <br /> Plan No— Contractor: C-4, <br /> Business Name: ``w-- Billing Address: <br /> Business Address: '42C'1'W C'/F/l,,t <br /> Business Phone No.: Billing Phone No.: <br /> Business Fax No.: Billing Fax No.: <br /> Contact: Contact: <br /> PLAN REVIEW FEES INSPECTION FEES PERMIT FEE <br /> Annual- <br /> Education,healthcare,De <br /> tention&Correctional Public <br /> Assembly,Business, schools, <br /> Storage,Mercantile and Churches <br /> Site Plan N/C Industrial. no charge Sprinkler $50 <br /> Multi-Family/Commerclal .03 at up to 800 sq ft $ 24.00 Standpipes $50 <br /> (Minimum Charge$24.00 801-1,500 sq ft $ 34.52 Fire Pump $50 <br /> Plan Revisions DBL 1.601-2.500 sq ft $ 60.02 Hoods $50 <br /> 2,501-3,500 sq It $ 90.02 Fire Alarm $50 <br /> SPRINKLER SYSTEMS 3,501-5,000 sq ft $ 127.52 LP Gas $50 <br /> 0-25 Heads $50 5,501-7,500 sq ft $ 187.52 Natural Gas $50 <br /> 26 plus Heads $100 7,501-10,000 sq ft $ 262.52 Fuel Tanks-per tank $50 <br /> STANDPIPE SYSTEM 10,001-15,000 sq ft $ '375.02 Sparklers $100 <br /> ❑'Per Riser $50 15,001-20,000 sq ft $ 525.02 Fire Works $500 <br /> FIRE PUMP 20,001-30,000 sq ft $ 750.02 Camp Fire(recreation' $25 <br /> Per Pump $100 30,00140,000 sq ft $ 1,050.02 Controlled Bum(15da'. $100 <br /> ;FIRE ALARM SYSTEM 40,001-60,000 sq ft $ 1,500.02 Hood/Duct $50 <br /> 0-25 Devices $50 60,001-80,000 sq ft $2,100.02 Place of Assembly $50 Annual <br /> 80,001-($2,100.02)per <br /> 26 plus Devices $100 ea add 1,000sq ft $ 0.06 Fire Protection $25 <br /> SUPPRESSION SYSTEMS (Business closed until Flammable Application $50 Annual <br /> Wet $50 violations corrected) Waste Tire Storage $50 Annual <br /> Dry $50 SPRINKLER SYSTEMS Generator<KW $100 <br /> CO2 $50 Hydro Undergrounds $45 Generator>30 KW $100 <br /> Other $50 Hydrostatic Test $65 per system Blo-Hazard Waste $100 Annual <br /> KITCHEN EXHAUST Acceptance Test $45 persystem Fumigation Tenting $50 <br /> Hood/Ducts $50 Hydrant Flow $75 Torch PottApplied $50 <br /> OTHER Haz.Materials $50-Annual <br /> 8 LP Installation per tank $50 FIRE ALARM SYSTEM <br /> Fuel Tank Installation $50 System Acceptance $50 <br /> (Per Tank) $50 Recall Acceptance $50 <br /> Natural Gas Installation $60 OTHER <br /> (Per System) Wail/Smoke Wall $15 perwall <br /> Spray Booth $50N/F'Ire <br /> LP Gas pertank <br /> Natural Gas $25 per system <br /> Tent 10'x10'or greater $15 per tent <br /> Fire Pump $45 <br /> Fire Suppression $30 <br /> System Acceptance <br /> ExhaustHood/Duct $30 <br /> Re4nspection DBL <br /> (other than annual) <br /> Inspection scheduled DBL <br /> and cancelled less than <br /> 24 hours <br /> Construction Insp. N/C <br /> Emergency Vehicle Acce $50 <br /> PLANS TOTAL INSPECTION TOTAL PERMITTOTALF-7 <br /> f GRAND TOTAL <br /> Comments: <br /> Date: !X Inspector: <br /> nlh <br />