Laserfiche WebLink
Whin 0.11d7ng,T.1t,W.1AI... <br /> FLORIDA ENERGY EFFICIENCY CODE FOR BUILDING <br /> CONSTRUCTION <br /> Envelope Leakage Test Report <br /> Prescriptive and Performance Method <br /> Project Name: Gad Builder Name: L ,!FAJ,1_,111AC Allj/W6 S' <br /> Street: 46 158 IAl, ,_1511 7X-, & Permit Office: <br /> -City, state,Zip: 27'C— 2V, Permit Number: <br /> L Design Location: Jurisdiction: <br /> Envelope Leakage Test Results <br /> Single Point Test Data: <br /> HOUSE PRESSURE: FLOW: <br /> Leakage Characteristics <br /> 1 1 7�7 07 CFM(50): J _1 �ss0Fall <br /> ACH(50): <br /> R402.4.1.2 Testing. The building or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding 7',air <br /> changes per hour in Climate Zones I•and 2...Testing shall be conducted with a blower door at a pressure of 02 inches w.g. ('50 <br /> Pascals). Testing shall be conducted by either individuals asAefined in Section 553.993(5) or (1), Florida Statutes or individuals <br /> licensed as sot forth in Section 489.105(3)(f), (g),or(I)or an approved third party.A written report of the results of the test shaill be <br /> signed by the party conducting the test and provided to the code official.Testing shall be performed at any time after creation of all <br /> penetrations of the building thermal envelope. <br /> 1.Exterior windows and doors,fireplace and stove doors shall be closed,but not sealed,beyond the intended weatherstripping or other <br /> Infiltration control measures; <br /> 2. Dampers including exhaust, intake, makeup air, backdraft and flue dampers shall be closed, but not sealed beyond intended <br /> infiltration'control measures; <br /> 3.Interior doors,If installed at the time of the test,shall be open; <br /> 4.Exterior doors for continuous ventilation systems and heat recovery ventilators shall be closed and sealed; <br /> 5.Heating and cooling systems,if installed at the time of the test,shall be turned off-,and <br /> 6.Supply and return registers,if installed at the time of the test,shall be fully open <br /> I hereby certify that the above envelope leakage Where required by the code official, testing sha 11 bE <br /> performance results demonstrate compliance with conducted by an approved third-party: A written report ort o' <br /> Florida Energy Code requirements in accordance with the test results shall be signed by the third :park <br /> section R402 4 12 471 conducting the test and provided to the code official. <br /> SIGNATURE: <br /> PRINTED NAME: BUILDING OFFICIAL: <br /> DATE: DATE: <br /> Testing was conducted in accordance with ANSVRESNETIICC 380 to meet the 2017 residential energy code. <br />