My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
18-19508
Zephyrhills
>
Building Department
>
Permits
>
2018
>
18-19508
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2019 10:15:21 AM
Creation date
1/31/2019 10:15:19 AM
Metadata
Fields
Template:
Building Department
Company Name
SILVERADO
Building Department - Doc Type
Permit
Permit #
18-19508
Building Department - Name
LENNAR HOMES LLC
Address
6670 PADEN WHEEL ST
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> Building and Construction Services(BCS) <br /> PAS C <br /> i COUNTY FLORIDA <br /> Blower Door. 'rest Report Form <br /> i (.�I'i:N`h.1("i�ti-l�!•'llF,i:V f')ri ACi;\. <br /> Proprrly Address: <br /> TTeistting Company Name: ' <br /> � Permit N: � J17� � , <br /> Test Date: g� Tester Name: r <br /> iTester Cen it: y� Contact Phone: <br /> I Email: <br /> i <br /> I _ <br /> i402.4.1.2 Testing.Building envelope air tightness shall be demonstrated by Section 402.4.1.2 <br /> i The building or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding 5 air changes <br /> per hour. Testing shall be conducted with a blower door at a pressure of 0.2 inches w.g.(50 Pascals).As required by <br /> the Building Official,testing shall be conducted by an approved third party.A written report of the results of the test <br /> shall be signed by the party conducting the test(including Agency Name)and provided to the Building Official prior <br /> i to Certificate of Occupancy issuance: Testing shall be performcd at any time after creation of all scheduled <br /> penetrations of the building thermal envelope. <br /> During testing:(check to verify condition met) <br /> >�Exterior windows and doors, fireplace and stove doors shall be closed, but.not sealed, beyond the intended <br /> weather-stripping or other <br /> i <br /> VJ Dampers including exhaust,intake,makeup air,backdraft and flue dampers shall be closed,but not sealed beyond ; <br /> V intended infiltration <br /> ,(Interior doors,if installed at the time of the test,shall be open <br /> I 1�Exterior doors for'continuous ventilation systems and heat recovery ventilators shall be closed and sealed <br /> i VVHeating and cooling systems,if installed at the time of the test,shall be turned off <br /> �Z1 supply and return'registers,if installed at the time of the test,shall be fully open <br /> 9 I <br /> Vb Building volume(ft') = oC <br /> Q50 Airflow at 50 Pascal(CFM) _ <br /> ACH5o Air changes per hour at 50 Pascal <br /> e <br /> Q50x 60-Vb= oC. ACHso(3.19ACHminimum) <br /> Pass I� Fail ❑ <br /> ❑Outside Air mechanically introduced to space(less than 3.0 ACID <br /> I hereby certify Marthe above envelope leakage performance results demonstrate compliance <br /> with Florid finery Code requirements in accordance with SectionR4/022.4.1.2, <br /> SignatufcofT,ester <br /> bite <br /> f <br />
The URL can be used to link to this page
Your browser does not support the video tag.