Laserfiche WebLink
:--:4f- <br /> WEINTRAUB <br /> i INSPECTIONS &FORENSIC,INC. <br /> 3868 Sun City Center Blvd.. Ph. 813-633-8000 <br /> Sun City Center,Fl.33573 Fx. 813-464-8026 <br /> CONCRETE SLABIFO LNDA: <br /> IN`SECTION REPORT <br /> INSPECTION DATE: 06/18/2018 <br /> CLIENT/Community: D.P H-TAMPA/ Silverado <br /> LOT#(s)/ADDRESS: # 32/6 / 6605 Wagon Trail <br /> SUPERINTENDENT: Chris Tallant <br /> WEATHER: 80 sunny <br /> INSPECTION CRITERIA/PROTOCOL <br /> OBSERVED&INSPECTED PASS FAIL <br /> 1. Verify Soil Compaction Report in permit box(if req. by jurisdiction X <br /> 2. Verfiy slab thickness formed is per permitted plans X <br /> 3. Verify exterior wall footing excavation free of debri X <br /> 4. Verify exterior wall footing reinforcing steel size and quantity per plans X <br /> 5 Verify isolated or monolithic footing pad reinforcing steel size and quantity X <br /> are per plans <br /> 6. Verify isolated or monolithic footing pad locations are per plans X <br /> 7' Verify that all continuous interior monolithic thickened slab foundations are <br /> width and depth per plans % <br /> 8' Verify that all continuous interior monolithic thickened slab foundations are <br /> correctly located per plans % <br /> 9 Verify slab welded wire reinforcing is gage and grid dimension specified on % <br /> plans <br /> Verify that all welded wire slab reinforcing is lapped per plans or Code <br /> 10. referenced standard whichever is greater X <br /> 11. Verify that all welded wire slab reinforcing is properly chaired each way at X <br /> 36"o/c <br /> 12. Verify vapor barrier is per plans for type and millage X <br /> 13. Verify vapor barrier is installed in accordance with manufacturer's X <br /> recommendations <br /> 14. Verify all seams are taped and conduit penetrations taped X <br />