Laserfiche WebLink
IlPrxll�rii�.w'ir1M>�litti�.al"!t'`ui-�.�e� ,t.. .• <br /> 5 <br /> .i Building and Construction Services(BCS) <br /> PA <br /> COUNTY FLORIDA <br /> OPEN sl�,N�:t�. v,«144:�► PLACES. <br /> Blower Door Test Report Form <br /> Property Address: Unit#: <br /> zt to 10 <br /> Permit#: Tistinj comps Name: ^ G <br /> Test Date: Tester Name: <br /> 6 <br /> TesterCert#: x Contact Phone: p O <br /> Email: Ad <br /> f <br /> 402.4.1.2 Testing.Building envelope air tightness shall be demonstrated by Section 402.4.1.2 <br /> The building or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding 5 air changes <br /> I per hour. Testing shall be conducted with a blower door at a pressure of 0.2 inches w.g.(50 Pascals).As required by <br /> the Building Official,testing shall be conducted by an approved third party.A written report of the results of the test <br /> shall be signed by the party conducting the test(including Agency Name)and provided to the Building Official prior <br /> to Certificate of Occupancy issuance. Testing shall be performed at any time after creation of all scheduled <br /> penetrations of the building thermal envelope. <br /> During testing:(check to verify condition met) <br /> 0- xterior windows and doors, fireplace and stove doors shall be closed, but not sealed, beyond the intended <br /> weather-stripping or other <br /> 13 Dampers including exhaust,intake,makeup air,backdraft and flue dampers shall be closed,but not sealed beyond <br /> intended infiltration <br /> 2(interior doors,if installed at the time of the test,shall be open <br /> O'rxterior doors for continuous ventilation systems and heat recovery ventilators shall be closed and sealed <br /> t.^rfieating and cooling systems,if installed at the time of the test,shall be turned off <br /> R-Slu`pply and return registers,if installed at the time of the test,shall be fully open <br /> Va Building volume(ft3) — _ 33 %, <br /> Qso Airflow at 50 Pascal(CFM) <br /> ACHso Air changes per hour at 50 Pascal <br /> Qso x 60 T Vb = 3. ACHso (3.0 ACH minimum) <br /> Pass Fail O <br /> Ca- I <br /> Outside Air mechanically introduced to space(less than 3.0 ACH) <br /> J hereby certify that the above envelope leakage performance results demonstrate compliance <br /> with Fl ida Energy Code requirements in accordance with Section R402.4.1.2. <br /> -jah'or <br /> ign t Tester Date <br />