Laserfiche WebLink
NOTII;E;: OF DES D RESTI'tICTIONS: Th : unr ersigned understands that this permlt may be subject to "do edi' rests-I dions" <br /> which may be more restrictive than Caw y rc:j ulations, The undersigned assurnes responsibility for complianc,(a with any <br /> applicable deed restrictions, <br /> UNLPIMNSED 6ONTRACTORS AND CONTRACTOR RESPONSIBILITiES: If the owner has hired a .contractor or <br /> contractors to undertake work, they may )e r gvired to be licensed In accordance with state and local regulations. If the <br /> contractor is not licensed as required b, i law, both the owner and contractor, may be cited for a misderneanor vlokatlon <br /> under state law,i If the owner or intended col tractor are uncertain as to what licensing requirements may lapply for• the <br /> Intended work, they are advised to contact tile. Pasco County Building Inspection Divislon—.1 Sectlon at 7:2Z-.847- <br /> 8009, furthermore, if the owner hal3 hired la contractor or contractors, he. is advised to have the contractors) sign <br /> portions of the "contractor Block" of this pppll�ation for which they will be rosponslble. If you, as the owner sign ;;'is the <br /> contractor, that may be an indication th'a he Is riot properly licensed and Is not entitled to permitting privlleg(,s in Pasco <br /> County, <br /> TRANSPORTATION IMPACTAJITiLITi!E ' IMi'1 CT AND RESOURCE RECOVERY FEES: The undersigned understands <br /> that Transportat on Impact Fees and Recours Recovery Nees may apply to the construction of new buildings, change of <br /> use In existing buildings, or expansion o exit ting buildings, as specified In Pasco County Ordinance numb:ei, 139-07 and <br /> 90-07, as amended, The undersigned sa sc a derstands, that such fees, as May be due, will be Identified at the time of <br /> permitting, It Is!further understood that 'ran portation Impact Fees and Resource Recovery Fees must: be. paid prior to <br /> recelwinci a "certificate of occupancy" or final power release; If the project does not involve a certificate of iccupancy or <br /> final power release, the fees must be p�ld pror to permit Issuance. Furthermore, it' Pasco County Water/ )e:wer Impact <br /> fees are due, they must bcy paid prior to perms Issuance In accordance with appllcaable Pasco County ordinan;c,c s. <br /> CONSTRUCTION LIEN LAW (Chapter 71,11, Iflorida Statutes, as amended): If valuation of work Is $2,500;00 or rnare, I <br /> certify that 1, the applicant, have beenl provided with a copy of the "Florida Construction Lien Law--Homeowner's <br /> Protection Guide" prepared by the Florida Department; of Agriculture and Consumer Affairs. If the applIcaril Is sorneone <br /> other than the owner", I certify that I haw) obtained a copy of the above described document and promise In good faith to <br /> 'dellvsr it to the"owner" prior to corrim )m enc e t, <br /> CONTRACTOR'S/OWNER'S AFFIIDAVI I yertify that all the Information in this application is accurate and that all work <br /> will be done in compliance; with all appy lable laws regulating construction, :coning and land development. Appiiration is <br /> .herel:py made to obtain a permit to do wort and Installation as Indicated, I certify that no work or instal let ion has <br /> commenced prior to Issuance of a permit it ar�d that all work will be performed to meek standards of all laws regulatingconstruction, County and City codes, zoning regulations, and land development regulations in the jurisdiction, I also <br /> certify that I understand that the regulations f other government agencies May 'apply to the Intended work, and that: it is <br /> my responsibility to identify what actions mu,t take to be In compliance, Such agencies Include but are not limited to: <br /> Department of Environment I Pi te.ctlon-cypress Sayheads, 1Netland Areas and Environmentally Sensitive <br /> Lands, WaterfWastewater Treatrrent. <br /> Southwest Florida Water Ma agement District-Wells, Cypress E3ayheads, Wetland Areas, Altc;ring <br /> Watercourses, <br /> Army Corps of Engineers-Sd awal s, Docks, Navigable Waterways. <br /> - Department of Health & Re habl itative S:ervlces/E:nvlronmental !-Health Unit-Wells, Wastewrate.r 1 matn'lent, <br /> Septic Tanks, <br /> US;Environmental Protectlo Agency-Asbestos abatement. <br /> Federal Aviation Ailthority-R -nways_ <br /> I understand that the following rostriction ap ly to the use of fill:' <br /> Use of fill Is not allowed 1n FI rod • one"V" unless expressly permitted. <br /> If the fill material Is to be �c_lse in Flood Zone "A", It Is understood that ai drainage plan •addressing a <br /> "compensating volume" will be s bmitted at time of permitting which Is prepared by a professional engineer <br /> Iicehsed by the State of Florida, <br /> If tie fill material is to be t sed n Flood Zone "A" In connection with a permitted building using stem wall <br /> construction, I certify that fill vill I e used only to fill the area within the stem well. <br /> if fill material is to .be use in any area, I certify that use of such fill will not adversely affect aclj'a properties. if use of fill Is fit and �to adversely affect adjacent properties, the owner may be cited for violat I <br /> ng <br /> the conditions of the bulldinl I permit issued under the attached permit application, for lots less than une (1) <br /> acre;which are elevated by f 11, al i engineered drainage plan is required, <br /> If I EnTi the AG N'T FOR THE OWNER, pro ise in good faith to Inform the owner of the permitting conditio.ri'3 set forth in <br /> this ,affidavit prior to commencing constitictioin. I understand that a separate permit may be required for electrical work, <br /> plumbing, signs, wells, pools, a.ir condl�ionlnlg, .gas, or other installations not specifically included in the eippliccatic)n. A <br /> perrnit issued shall bo construed to'be ' llce;nse to proceed with the work sand not as authority to.violate, o8ricel, alter, or <br /> set .aside any provislons of the technical cod ,$, nor shall issuance of a permit prevent the 131.11idirig Official from thereafter <br /> ermll: issued shall requiring a correction of errors in plans, corn,; ructlon or violations Ever of any comes. y p gall bEac,ame invalid <br /> unless the work authorized by such per nit 1 commenced within :six months of permit Issuance, or If work:r:"uthoriz(.,cd by <br /> F P <br /> the permit Is suspended or abandoned fbor a p er•iod of six (6) months after the time the worn, is commenced, htn extension <br /> , <br /> may be requested, in writing, from the Build ng.Official for a period not to exceed ninety (90) days and will demon. trate <br /> justifiable cause for the extension, If wo k ce ses for ninety (90) consecutive days, theQob is considered abendone+.l. <br /> W�ARNINt► TolOWNE3R YOUR FAIL II�t,l3 TO-RECORD +_NOTICE-OF-COMMENCEMENT MAY Ri7' IN YOUR <br /> OAYING TVICIE FOFS IMpRC)VEltAtt T '1'0 YOUR PROPERTY, IF YOU VttITEf�C) 'rO OBTAIN FINAN4�11119(';I, 1; LILT <br /> WI.L, IAYCJ.t7R ENDER OR AiN A1'"TOR EY_ 3EFORE-RE,CORi)iNG YO11 itIOTIC rE OF (3QIV Mf---tICEM1=l lT_ <br /> FLORIDA JU T(F.S, 11 Ali) <br /> rti �s.�,3 • <br /> OWIVIEiR c�R AGEN '„D _�=�I _..— _ _ CONTRACTOR ._.' <br /> Subscribed and sworn b: �'afflrn ed bef re a this <br /> Subsc;ribed a m fo( ' affirm heft),' a his (' •. <br /> —bY __ .�— <br /> Wha Is/aree personirlly known to me or Figs/have p ocruc d Who islare son Ic tawn to me or he+as Identifl attend <br /> Identlflcatlon _ — --- -- <br /> hlota Public _ -- <br /> u — _ Notary Public <br /> Co misslo _—. __ 9II �—•._.. —..� <br /> Commission No. — __.____ --- — ar : blflr711sSiora 4 FF 150422 <br /> ci stamped - - Namo of Notary typed t1;`sta �uutrovrWnina"rnnnaeooaasao�e <br /> Narnei of Notary typed,printed r p ��— _� ---. <br />