Laserfiche WebLink
FORM R405-2017 <br /> FLORIDA ENERGY EFFICIENCY CODE FOR BUILDING CONSTRUCTION <br /> Florida Department of Business and Professional Regulation - Residential Performance Method <br /> Project Name: R0318106 Builder Name: <br /> Street: 5023 Summer Hill Dr. Permit Office: City of Z phyrhills <br /> City,State,Zip: Zephyrhills,FL,33542 Permit Number: I' .t 1 <br /> Owner: Butterfield Investments, Inc. Jurisdiction: 0 •kr`' <br /> Design Location: FL,Tampa County:: Pasco(Florida Climate Zone 2) <br /> 1. New construction or existing New(From Plans) 9. Wall Types(1642.7 sqft.) Insulation Area <br /> 2. Single family or multiple family Single-family a.Concrete Block-Ext Insul,Exterior R=5.0 1381.30 ftz <br /> b.Frame-Wood,Adjacent R=13.0 261.33 ftz <br /> 3. Number of units,if multiple family 1 c.N/A R= ft <br /> 4. Number of Bedrooms 4 d.NIA R= f 2 <br /> 5. is this a worst case? No 10.Ceiling Types (1780.0 sqft.) Insulation Area a.Under Attic(Vented) R=,30.0 1780.00 ftz <br /> 6. Conditioned floor area above grade(ftz) 1780 b.N/A R= ftz <br /> Conditioned floor area below grade(ftz) 0 c.NIA R= ft2 <br /> 11.Ducts R ftz <br /> 7. Windows(179.0 sqft.) Description Area a.Sup:Attic,Ret:Attic,AH:Garage 6 225 <br /> a. U-Factor: Dbl,U=0.65 144.00 ftz <br /> SHGC: SHGC=0.35 <br /> b. U-Factor: Dbl,default 35.00 ftz 12.Cooling systems kBtu/hr Efficiency <br /> SHGC: Clear,default a.Central Unit 32.6 SEER:15.00 <br /> c. U-Factor: NIA ftz <br /> SHGC: 13.Heating systems kBtu/hr Efficiency <br /> d. U-Factor. N/A ftz a.Electric Heat Pump 34.0 HSPF:8.50 <br /> SHGC: <br /> Area Weighted Average Overhang Depth: 2.369 ft. <br /> Area Weighted Average SHGC: 0.418 14.Hot water systems <br /> 8. Floor Types (1780.0 sqft.) Insulation Area a.Electric Cap:50 gallons <br /> EF:0.970 <br /> a.Slab-On-Grade Edge Insulation R=0.0 1780.00 ftz b. Conservation features <br /> b.N/A R= ftz None <br /> c.N/A R= ftz 15.Credits None <br /> Glass/Floor Area: 0.101 Total Proposed Modified Loads: 57.99 PASS <br /> Total Baseline Loads: 58.09 <br /> I hereby certify that the plans and specifications covered by Review of the plans and 'THE Sr <br /> this calculation are in compliance with the Florida Energy specifications covered by this k�� fiOR <br /> Code. / calculation indicates compliance <br /> with the Florida Energy Code. ++++, '-. =y ;,•� <br /> PREPARED BY: Before construction is completed <br /> DATE: 03-11-2018 this building will be inspected for y <br /> compliance with Section 553.908 <br /> I hereby certify that this building,as designed,is in compliance Florida Statutes. <br /> with the Florida Energy Code. ®D yvEZ�� <br /> OWNER/AGENT: BUILDING OFFICIAL: <br /> DATE: DATE: - <br /> - Compliance requires certification by the air handier unit manufacturer that the air handier enclosure qualifies as <br /> certified factory-sealed in accordance with R403.3.2.1. _ <br /> -Compliance requires an Air Barrier and Insulation Inspection Checklist in accordance with R402.4.1.1 and this project requires an <br /> envelope leakage test report with envelope leakage no greater than 7.00 ACH50(R402.4.1.2). <br /> 3/9/2018 3:47 PM EnergyGauge®USA-FlaRes2017 Section R405.4.1 Compliant Software Page 1 of 6 <br />