My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
18-19543
Zephyrhills
>
Building Department
>
Permits
>
2018
>
18-19543
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2019 10:40:55 AM
Creation date
1/31/2019 10:40:53 AM
Metadata
Fields
Template:
Building Department
Permit #
18-19543
Building Department - Name
SABRA HEALTH CARE HOLDINGS III
Address
37411 EILAND BLVD
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TRNTY ERD <br /> 5.7 For mechanically attached insulation or membrane or strip-bonded Insulation,the maximum design pressure <br /> for the selected assembly shall meet or exceed the Zane 1 design pressure determined in accordance with FBC <br /> Chapter 16. Zones 2 and 3 shall employ an attachment density designed by a qualified design professional to <br /> resist the elevated pressure criteria. Commonly used methods are ANSI/SPRI WDi,FM Loss Prevention Data <br /> Sheet 1-29, RAS 117 and RAS 137. Assemblies marked with an asterisk* carry the limitations set forth in <br /> Section 2.2.10.1 of FM Loss Prevention Data Sheet 1-29(January 2016)for Zone 2/3 enhancements. <br /> 5.8 For assemblies with all components fully bonded in place, the maximum design pressure for the selected <br /> assembly shall meet or exceed critical design pressure determined in accordance with FBC Chapter 16. No <br /> rational analysis is permitted for these systems. <br /> 5.9 For mechanically attached insulation or membrane over existing roof decks,fasteners shall be tested in the <br /> existing deck for withdrawal resistance. A qualified design professional shall review the data for comparison <br /> to the minimum requirements for the system. Testing and analysis shall be in accordance with ANSI/SPRI FX- <br /> i or TAS 105. <br /> 5.10 For bonded insulation or membrane over existing substrates in a re-roof(tear off)or recover installation,the <br /> existing deck or existing roof surface shall be examined for compatibility with the adhesive to be installed. If <br /> any surface conditions exist that bring system performance into question, field uplift testing in accordance <br /> with ANSi/SPRI IA-1,ASTM E907, FM Loss Prevention Data Sheet 1-52 or TAS 124 shall be conducted on <br /> mock-ups of the proposed new roof assembly. <br /> 5.11 For bonded insulation or membrane over existing substrates in a recover installation,the existing roof system <br /> shall be capable of resisting project design pressures on its own merit to the satisfaction,of the Authority <br /> Having Jurisdiction, as documented through field uplift testing in accordance with ANSI/SPRI IA-1, ASTM <br /> E907,FM Loss Prevention Data Sheet 1-S2 or TAS 124. <br /> 5.12 Metal edge attachment(except gutters),shall be designed and installed for wind loads in accordance with FBC <br /> Chapter 16 and tested for resistance in accordance with ANSI/SPRI ES-1 or RAS 111, except the basic wind <br /> speed shall be determined from FBC Figure 1609. <br /> 5.13 All products in the roof assembly shall have quality assurance audit in accordance with the FBC and F.A.C. <br /> Rule 61G20-3. <br /> 6. INSTALLATION: <br /> 6.1 Mule-Hide TPO-c Single Ply Roof Systems shall be installed in accordance with Mule-Hide Products Co.,Inc. <br /> published installation instructions,subject to the Limitations/Conditions of Use noted herein. <br /> 6.2 System attachment requirements for wind load resistance are set forth in Appendix 1. "MDP" = Maximum <br /> Design Pressure is the result of testing for wind load resistance based on allowable wind loads, and reflects <br /> the ultimate passing pressure divided by 2(the 2 to 1 margin of safety per FBC 1504.9 has already been <br /> applied). Refer to FBC 1609 for determination of design wind pressures. <br /> 6.3 For mechanically fastened membrane systems(Type D)over profiled steel deck, membrane shall be installed <br /> running perpendicular to steel deck flutes. <br /> 7. BUILDING PERMIT REQUIREMENTS: <br /> As required by the Building Official or Authority Having Jurisdiction in order to properly evaluate the installation of <br /> this product. <br /> 8. MANUFACTURING PLANTS: <br /> Contact the noted CIA agency for Information on product locations covered to F.A.C.Rule 61G20-3 CA requirements. <br /> 9. QUALITY ASSURANCE ENTITY: <br /> UL,LLC—QUA9625;(414)248-6409;karen.buchmann@ul.com <br /> -THE 26-PAGES THAT FOLLOW FORM PART OF THIS EVALUATION REPORT- <br /> Exterior Research and Design,LLC. Evaluation Report M15060.06.09-R4 <br /> certiftate ofAuthor&ation#9503 FBC NON-HVHZ EVALUATION F1.12772-114 <br /> Mule-Hide Products Co.,Mr. Revision 4,04/03/2017 <br /> Page 4 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.