My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
18-19545
Zephyrhills
>
Building Department
>
Permits
>
2018
>
18-19545
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2019 10:43:16 AM
Creation date
1/31/2019 10:43:14 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
18-19545
Building Department - Name
38721 9TH AVE FAMILY INC TRUST EH
Address
38721 9TH AVE
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ERD <br /> r 1RI Ii 9 . <br /> 6.5 ARCADIA" : <br /> LOW AND STANDARD SLOPE STEEP SLOPE <br /> Use SIX nails for even'frill shingle located as shown before rise SIX nails and FOUR spots of asphalt roofing cement for even•hill <br /> shingle,is shown below.Apply asphalt roofing cement 1"(25 rani) <br /> ---—�---,-- from edge of shingle.Asphalt roofing cement meeting ASTNI D 4586 <br /> T}gae II is suggested. <br /> —1'{25mm1 1'l25m+nl—. <br /> Nail Lints <br /> rlail <br /> Nail Line 1'125 MMl 1'(25 mm)—+ <br /> Figure I Use six nrd(s for avoy fall shingle. �, c, Ld�c, <br /> Figure 3.Use six nails rind four spots<f asphalt <br /> roafi"g cetnent on ste%slopes. <br /> 6.5.1 Hip&Ridge for ArcadiaTm- Cedar Cresf".Cedar Crest'u IR <br /> Use two (2), minimum 1%-inch long fasteners per shingle. For the starter shingle, place fastener 1-inch <br /> from each side edge and about 2-inch up from the starter shingle's exposed butt edge,ensuring minimum <br /> '/-inch embedment into the deck, or full penetration through the deck. For each full Cedar Crest shingle, <br /> place fasteners 8-5/8-inch up from its exposed butt edge and 1-inch from each side edge. <br /> For ASTM D3161,Class F performance use BASF"Sonolastic"NP111"adhesive or Henkel"PL® <br /> Polyurethane Roof&Flashing Sealant",in accordance with CertainTeed requirements,to hand-seal <br /> Cedar Crest shingles. Apply NP 1 or PL adhesive from the middle of the shingle's raised overlay on the <br /> top piece and extending approximately 4-inch along the sides of the headlap along a line%to 1-inch from. <br /> each side of the shingle's headlap. Immediately align and apply the overlying shingle,gently pressing tab <br /> sides into the adhesive,and install nails. To secure the other side,apply a 1-inch diameter spot of NP 1 or <br /> PL adhesive between the shingle layers. <br /> Hand-sealing adhesive <br /> 4" <br /> —L I <br /> 203 ptm)A (305 n1m) <br /> pa ure <br /> r----�12S\nm1 <br /> '1" <br /> Dab of asphalt <br /> cement between <br /> shingle layers <br /> Exterior Research and Design,LLC. Evaluation Report 3532.09.05-R13 <br /> Certlffcate of Authorization#9503 6TM EDITION(2017)FBC NON-HVHZ EVALUATION FL5444-R12 <br /> CertalnTeed Asphalt Roof Shingles;(610)651-5847 Revision 13:09/05/2017 <br /> Page 5 of 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.