Laserfiche WebLink
TRINITY!ER® <br /> 6.12 PATRIOT'"": <br /> LOW AND STANDARD SLOPE STEEP SLOPE <br /> Use FOUR nails for every full shingle localcd as short❑belon. Usc POUR nails and four spots of asphalt roofing cement for even,full <br /> shingle as shown below:,Isphaft roofing cement meeting ASI'Al D4586 <br /> Tipe 11 is suggested.Apply 1"(25 nim)spots of aspl dt roofing <br /> 5^alaM cement as shown. <br /> __ CAUTION:Excessive use of roofing cement can cause shingles to blister. <br /> f25 nmi j j 1'f25cnj- <br /> 055 m ny <br /> ( �") i333 na; 1333 mri — -—————— —— <br /> 5•:(5' t• <br /> { floollog Cement) <br /> t'ldinJ 1333�I i3r3r,.ri <br /> 6.12.1 Hip & Ridge for Patriot"": Refer to instructions herein for Cedar CrestTM, Cedar CrestT IR, Shadow Ridge'', <br /> NorthGate or Shangle RidgeT""hip and ridge shingles. <br /> 7. LABELING: <br /> 7.1 Each unit shall bear a permanent label with the manufacturer's name, logo, city, state and logo of the <br /> Accredited Quality Assurance Agency noted herein. <br /> 7.2 Asphalt shingle wrappers shall indicate compliance with one of the required classifications detailed in FBC Table <br /> 1507.2.7.1/R905.2.6.1. <br /> 8. BUILDING PERMIT REQUIREMENTS: <br /> As required by the Building Official or Authority Having Jurisdiction in order to properly evaluate the installation of this <br /> product. <br /> 9. MANUFACTURING PLANTS: <br /> Contact the named QA entity for information on which plants produce products covered by Florida Rule 61G20-3 QA <br /> requirements. <br /> 10. QUALITY ASSURANCE ENTITY: <br /> UL LLC—QUA9625;(414)248-6409;karen.buchmann@us.ul.com <br /> -END OF EVALUATION REPORT- <br /> Exterior Research and Design,LLC. Evaluation Report 3532.09.05-1133 <br /> Certificate of Authorization#9503 6'EDITION(2017)FBC NON-HVHZ EVALUATION F1.5444-1112 <br /> CertainTeed Asphalt Roof Shingles;(610)651-5847 Revision 13:09/05/2017 <br /> Page 12 of 12 <br />