Laserfiche WebLink
Plan Review <br /> : W:indows & Doo`rs.. <br /> 1)- Need manufacturing installation specifications <br /> 2) Must.meet' section's R308 and-R612 of the 2017 F.B.C: <br /> 3) if windows are-to be installed inside:the historical district,they-Will need-to be approved' <br /> bythe-historical committee.. <br /> 4), No other work shall be permitted.(framing; plurribing;and.:mechanical) unless otherwise <br /> specified: : . <br /> 5 .. This is.for re lacement lass for lass only If� ou.wish to change from screen.or vinyl'). p (g. . glass.) Y Y g <br /> windows to.glass;then additional information is required.:, <br /> 6) All to wall connections:shall be left.-visible for. inspection. <br /> 7) All labeling and stickers shal <br /> l inspection: . <br /> .. 8):. No Work shall start without permit first. : . . <br />