My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
18-19574
Zephyrhills
>
Building Department
>
Permits
>
2018
>
18-19574
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2019 11:02:19 AM
Creation date
1/31/2019 11:02:19 AM
Metadata
Fields
Template:
Building Department
Company Name
SUMMERHILL
Building Department - Doc Type
Permit
Permit #
18-19574
Building Department - Name
GERTH,OMER & MARY
Address
5016 SUMMERHILL DR
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work Order <br /> Environmental Contractors 4/17/2018 <br /> 10221 Hwy 301 Summary: SYSTEM C/O <br /> Dade City F133525 Reference#: 10142-112 <br /> (352)567-5515 Tech: JON <br /> Bill To: Job Name: <br /> Omer&Jeannine Gerth Omer&Jeannine Gerth <br /> 501.E Summer Hill Dr. 5016 Summer Hill Dr. <br /> Zephyrhills, FL 33542-8202 Zephyrhills, FL 33542-8202 <br /> (813)788-2049 H (813)788-2049 H <br /> Description of Work <br /> INSTALL 3 Ton , Heat Pump 14 SEER, R-410, BRYANT/CARRIER Split System, with 5 KW heat strips, new <br /> digital thermostat, VGF, AHU Stand, pad, PERMIT$5550 +$300.00 <br /> 115271A BRYANT 3 Ton Ht. Pump-14 SEER-VGF-V/S-AHU <br /> Model#214DNA036000 Serial# 1218E19866 <br /> CARRIER Air Handler <br /> Model# FB4CNP036L00 Serial# 1218F45119 <br /> Installed Equip Install Date Model# Serial Equip.Warr Labor Warra Service Exp <br /> CARRIER A/H-old -- <br /> 3 Ton FRIGIDAIRE Heat Pump-10 6/29/2005 FT3BA-036KA FTA050303764 <br /> Seer(Stellar Series) <br /> • FILTER: 18X24+PREF CHRIS B+MRS=EMPHYSEMA-NEEDS A/C+ <br /> * OFF SOUTH AVE BET 20TH & RR+12-26-21 <br /> All material is guaranteed to be as specified.. All work to be completed in a professional manner according to standard practices. Any alteration or <br /> deviation from above specifications involving extra costs will be executed only upon written orders and will become an extra charge over and above <br /> the estimate. All agreements contingent upon delays beyond our control. Purchaser agrees to pay all costs of collection,including attorney's fees. <br />
The URL can be used to link to this page
Your browser does not support the video tag.