NOTICE OF DEED RESTRICTIONS: The undersigned understands,that.this,permit may be subject to"deed"restrictions°
<br /> which.may,be more:restrictive-than-County regulations. The<undersigned assumes responsibility'foi•compliance with=ariy``'`
<br /> applicable deed restrictions.
<br /> UNLICENSED CONTRACTORS AND CONTRACTOR RESPONSIBILITIES: If the owner-has hire' &a'-contractor or
<br /> contractors'to undertake work, they may be required to be,licensed in accordance with state and:local regulations,.',lf=:the y
<br /> contractor is not.licensed as required by law, both the owner and:contractor-rriay.*be cited fora-misdemeanor.violation
<br /> under state law. If the owner or intended contractor are uncertain as to what licensing requirements,<may;;apply.forthe
<br /> intended work, they are advised to contact'the Pasco County Building Inspection Divisioicerising Section at 727-847-
<br /> 8009., - Furthermore, if the owner has hired a contractor or contractors,' he'-is advised to have the contractor(s). sign--,,,
<br /> portions of the "contractor Block" of this application for,which they will be responsible.-.1f you, av��the_"ijW*ier sign as the
<br /> contractor., that may be an indication that he,is not properly licensed and is not entitled to permitting privileges in Pasco. ,
<br /> County.
<br /> TRANSPORTATION IMPACTIUTILITIES IMPACT AND RESOURCE RECOVERY FEES:"The undersigned understands
<br /> that Transportation Impact Fees and Recourse Recovery Fees may.apply to the construction of new buildings, change-=of 1"
<br /> use in existing buildings, or expansion of existing buildings, as specified in Pasco County Ordinance number 89-07 and
<br /> 90-07, as amended. The undersigned-also understands, that such.fees, as may be-due, will be identified at:.the'timeiof ;
<br /> permitting. It is further understood that Transportation impact Fees and Resource Recovery Fees must be paid prior to
<br /> receiving a "certificate of occupancy" or-final power release. If the,project does not involve a certificate of occupancy,,oc�: -
<br /> final power release, the fees must be paid prior to permit Issuance. Furthermore, if Pasco County Water/Sewer.-Impact.
<br /> fees are due, they must be paid prior to permit issuance in accordance with applicable Pasco County ordinances.
<br /> CONSTRUCTION LIEN LAW(Chapter 713, Florida Statutes,as amended): If valuation of work is$2,500.00.or-more,.I,;
<br /> certify that I, the applicant, have been provided with, a copy, of the "Florida Construction Lien. Law-=Homeowner's
<br /> Protection Guide" prepared by the Florida Department of Agriculture and Consumer Affairs. If the applicant-,is someone
<br /> other than the"owner", I,certify that I have obtained a copy of the above described document and promise-in.good±faith-to .
<br /> deliver'.it lo the"owner"prior to commencement,
<br /> CONTRACTOR'SIOWNEWS AFFIDAVIT: I certify that all the information in this application is accurate and-that all work
<br /> will be done in compliance with all applicable laws regulating construction, zoning and land-development. Application is
<br /> hereby made to obtain a permit to do work-and installation as indicated. I certify that no work or.installation has
<br /> commenced prior to issuance of a permit and that all work will be performed to meet standards of all laws regulating
<br /> construction, County and City codes, zoning regulations, and land development regulations in the jurisdiction. I also
<br /> certify that i understand that the regulations of other government agencies may apply to the intended work, and that it is
<br /> my responsibility to identify what actions I must take to be in compliance. Such agencies include but are not limited to:
<br /> - Department of Environmental Protection-Cypress Bayheads; Wetland Areas and Environmentally Sensitive
<br /> Lands,Water/Wastewater Treatment.
<br /> - Southwest Florida Water Management District-Wells, Cypress Bayheads, Wetland Areas, Altering
<br /> Watercourses.
<br /> - Army Corps of Engineers-Seawalls, Docks, Navigable Waterways.
<br /> - Department of Health & Rehabilitative Services/Environmental Health Unit-Wells, Wastewater.Treatment,
<br /> Septic Tanks.
<br /> US Environmental Protection Agency-Asbestos abatement.
<br /> Federal Aviation Authority-Runways.
<br /> I understand that the following restrictions apply to the use of fill:
<br /> - Use of fill is not allowed in Flood Zone"V"unless expressly permitted.
<br /> If the fill material is to be'used in. Flood Zone "A", it is understood that a drainage plan addressing a
<br /> "compensating volume" will be submitted at time of permitting which is prepared by a professional engineer
<br /> licensed by the State of Florida.
<br /> If the fill material is to be used in Flood Zone "A" in connection with a permitted building using stem wall
<br /> construction, i certify that fill will be used only to fill the area within the stem wall.
<br /> If fill -material is'to be used in any area, I certify that use of such-fill will not adversely affect adjacent
<br /> properties. If use of fill is found to adversely affect adjacent properties, the owner may be cited for violating
<br /> the conditions of the-building permit issued under the attached permit.application, for lots less than one (1)
<br /> acre which are elevated by fill, an engineered drainage plan is required.
<br /> If I am the AGENT FOR THE OWNER, I promise in good faith to inform the owner of the permitting conditions set forth in
<br /> this affidavit prior to commencing construction. I understand that a separate permit may be required for electrical work,
<br /> plumbing, signs, wells, pools, air conditioning, gas,.or-.other installations not specifically included in the application. A
<br /> permit issued shall-be construed to be a license to proceed with the work and not as authority to violate, cancel, alter, or
<br /> set aside any provisions of the technical codes, nor shall issuance of a permit prevent the Building Official.from thereafter
<br /> requiring a correction of errors in plans, construction or violations of any codes. Every permit issued shall become invalid
<br /> unless the work authorized by such permit is commenced within six months of permit issuance, or if work authorized by
<br /> the permit is suspended or abandoned for a period.of.six(6)months after the time the work is commenced. An extension
<br /> may be requested, in writing, from the Building Official for a period not to exceed-ninety (90) days and will demonstrate
<br /> justifiable cause for the extension.- If work-ceases.-for ninety(90)-consecutive-days,-the job-is-considered-abandoned,- -
<br /> WARNING TO OWNER: YOUR FAILURE TO.RECORD . NOTICE OF COMMENCEMENT MAY RESULT IN YOUR
<br /> PAYING TWICE FOR IMPROVEMENTS,TO.YOUR PROPERTY..IF YOU:,INTEND-TO OBTAIN FINANCING;CONSULT
<br /> WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT.
<br /> FLORIDA JURAT(F.S.117.03)
<br /> OWNER OR AGENT / CONTRACTOR
<br /> Subscribed and swam to(or affirmed)before me this S bscrib and swo to affi ed efare me this
<br /> ' by -Z3-�'d by ;14" or an
<br /> Who is/are personally known to me or has/have produced Who is/a e p rsonally known to me or has/have produced
<br /> as Identification. r"r uce., as identification.
<br /> Notary Public Notary.Public
<br /> Commission No. Comn.. ton N
<br /> =gSa1..Ygr:
<br /> Commission#FF 154422
<br /> Name of Notary typed,printed or stamped Name of Notary, O e
<br /> ,a .' n,��. Bonded r atn Insurance B003B5.7019
<br /> o.......
<br /> i•.
<br />
|