Laserfiche WebLink
A s.a i ra n <br /> MFO*'F'LOPIDA <br /> QUOTE Date SignCrafters of Central FL Inc <br /> Feb 26,2018 1915 Greenleaf Lane <br /> Expiry Leesburg,FL 34748 <br /> Zephryhills May 27,2018 352-323-1862 <br /> Quote Number Lic#ES12001170 <br /> QU-1137 <br /> Reference <br /> Channel Letters <br /> SIGNCRAFTERS <br /> 45-8013717756-0 <br /> Description Quantity Unit Price Discount Tax Amount USD <br /> Custom Channel Letters with LED 3 lamp/12 volt 1.00 8,000.00 0.00% Tax Exempt 8,000.00 <br /> illumination,ACM backs,.50 aluminum returns <br /> and acrylic faces with 1 inch jewellite trim pieces. <br /> Built to UL standards. <br /> 25.5 X 28 custom logo cabinet with white acrylic <br /> faces,translucent vinyl and black trimcap.Logo <br /> colors to be 3M 294C Bristol Blue Translucent and <br /> Avery 761 Green Yellow Translucent.12.5" <br /> ZEPHRYHILLS COMMUNITY letters with white <br /> acrylic faces and black trim cap.All signs to be <br /> raceway mounted.Raceways to be painted <br /> SW6232 Misty. <br /> Price includes fabrication and installation of new <br /> signage.Price does not include removal of <br /> existing signage,no wall repair and no painting. <br /> Client is responsible for relocation of existing <br /> gutters and/or obstacles that would hinder <br /> installation prior to our arrival. <br /> Permits,engineer and procurement are <br /> billed/invoiced separately upon completion and <br /> pricing is based on actual fees from the governing <br /> municipality and engineer. <br /> Discount 1.00 (150.00) (150.00) <br /> Subtotal 7,850.00 <br /> TOTAL USD 7,850.00 <br /> Terms <br /> TERMS:Non-Refundable,50%deposit due before work begins.Balance due immediately upon completion ofjob.Electricity must be supplied(by <br /> others)within six(6)feet of the sign site.Permitting&Engineering must be obtained by Sign Crafters and paid for by the customer,billed separately at <br /> completion ofjob(unless an inclusive price was agreed upon up front).Signs are not put into fabrication until permit is obtained by governing <br /> municipality.Obtaining proper permitting takes 1-3 weeks on average.Fabrication&Install of yourjob after the issuance of the permit is contingent <br /> upon the workflow within our company at that point in time,however our best effort will be made to expedite this process. <br /> I have read and agree to the terms and conditions above and attached to this estimate: <br />