GRAND HORIZONS
Building Department - Doc Type
Permit
Permit #
18-19548
Building Department - Name
JONES,DARLENE & FREDERICK
Address
37545 LORENA AVE
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3920 Watt to 10080 Watt DC Photovoltaic System Electrical Diagram <br /> Solaredge SE 760OA-US Inverter with <br /> OOOOne to Two strings of Solarworld SW280 Modules and Solaredge P300 Optimizers <br /> Tot��� Optional Supply Side Connection Maximum 18 modules per <br /> NEC 705.12A 10 string and minimum 8 modules <br /> Solarworld <br /> Lt SW280 280 , #t8 per string as per Solaredge <br /> N M Modules <br /> olaredge P300 <br /> #6 bare copp Power Optimizers <br /> GEC (3)#6 Utility meter <br /> THHNITHWN•2 200A <br /> 13W'PVC condu (4)#10 AWG PV wire 2-B,2-R Module power ptimizer <br /> so A fused (1)#5 Bare Copper Factory Factory Cable Solarworld SW280 <br /> disconnectwith = DC leads <br /> 40Afuses existing Main Distribution Solaredge P300 PowerOpt!mizer Module Specs <br /> ei�oae Panel :280] <br /> Max input power:300 Wp-dc Pmax:280Wp <br /> #8 Max.Input DC Voltage:48 VDC Voc: 39.5 V <br /> 200A Panelboard Max Input current: 12.5A Vmpp:31.2 V <br /> MPPT Range:8.48 VDC Isc: 9.71 A <br /> with 200A main Max Output Voltage:80 VDC <br /> breaker Max Output current: 15A Impp: 9.07 A <br /> O 200A-2 Notes: All work to meet or exceed NEC 2011 <br /> Olunction box to be located within the array boundary. Junction box must be minimum Nema 3R UL listed <br /> Oenclosure.Free air conductors must be installed in raceway if readily accessible as per 690.31(A). <br /> (DO <br /> (4)#10 AWG THHNITHWN-2 2OThe minimum volume of the Nema 3R enclosure for the transition of PV wire to THWN-2 wire shall be <br /> O (1)#8 AWG THHNrrHWN-2 42 cubic inches. Heyco 5 wire Masthead gland seals or similar connector are required as strain relief <br /> Nema 3R 2-13,2-R,1-G for PV wire into Nema 3R junction box at array. <br /> O 40A/2 Junction 3/4"EMT,FMC(inside structure) interconnection with 40 Amp 2 pole OCPD via 2011 NEC 705.12(D)(2)Load Side Connection. The 40 A <br /> Box LFNC,PVC(outside structure) backfed breaker must be located at the opposite end of the bus from the 200 A main supply breaker <br /> I <br /> 690.31E 4O. The required PV Backfed breaker plus the main breaker rating must be less than or equal to 120%of <br /> 1 ) the Main service bus rating. 705.12(D)(2) <br /> Solaredge SE7600A-US OOptional Supply Side connection via 705.12A using parallel line taps in a NEMA 3R box(as required) <br /> _ Transformerless Inverter with using NSI IPCS4002, Ilsco]PC-KUP-L or NSI Tork IPLD 3/0-3 Multi-Tap Connector or equivalent. <br /> I-I °C inte rated DC disconnect. <br /> existing I I AC g 6OPV service disconnecting means for"optional"supply side connection must have neutral/EGC bond <br /> grounding rill <br /> , within and must be listed as"suitable for use as service equipment" 230.66 <br /> electrode (4)#8 AWG THHN/THWN-2 7O. The fuses in the disconnect for the"supply side"option must be rated to handle the maximum short- <br /> 1-B,1-R,1-W,1-Gcircuit current available at the supply terminals.110.9,110.10 Over-current protection for the supply side <br /> , 314"EMT,FMC,LFNC, connected conductors shall be located within 10 feet of the connection to the service. 705.31 <br /> b or PVC <br /> 88.. The following label is required on meter can and main panelboard"Service <br /> q q _________ is fed from dual power sources Utility and Photovoltaic system" <br /> 8. 'PV input Do not relocate this OCPD"label required adjacent to backfed breaker. 705.12(d)(7) <br /> (4)#8 AWG THHNrrHWN-2 10 Bonding of module to rail and module to module accomplished through WEEB <br /> 1-B,1-R,1-W,1-G washers or self grounding mid-clamps. <br /> 3/4"EMT,FMC,LFNC,or PVC 11. "Warning:DC conductors of this system are ungrounded and may be energized"required on the <br /> DC Disconnect 690.35F <br /> 12.."Warning:Photovoltaic Power Source"label required on conduit per 690.31(E)(3)(4) <br /> 13.Total voltage drop%for all circuits based on listed conductors is 1.64%based on: <br /> If required by Utility A.100 foot round trip PV wire open air run to Nema 3R junction box <br /> 60A 240V AC Disconnect with label: 11 B.150 round trip source circuits(THWN-2)to termination in DC disconnect <br /> C.30 feet round trip Inverter Output circuit to point of interconnection. <br /> Disconnect Switch On-site Utility Generation DC Disconnect Label D.Conductors should be sized for max 2%voltage drop to decrease possible <br /> Disco inverter shutdown and production losses due to AC voltage rise at the inverter. <br /> Requirements P g <br /> Vmpp 350 vdc <br /> PV AC Disconnect Label Requirements Vmax 500 vdc <br /> Operating Current:32A Im 11.2 to 23 A based on array--A Formula to figure IMPP for of Disconnect <br /> PP ( Y Total STC DC power rating of array in Watts <br /> Operating Voltage: 240V nameplate rating) divided by 350 Vdc equals IMPP In Amps. <br /> Imax 15 or 30 A (1 or 2 strings) ex:3920 watts/350 Vdc=11.2 Amps <br />