My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
18-19548
Zephyrhills
>
Building Department
>
Permits
>
2018
>
18-19548
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2020 1:43:43 PM
Creation date
2/1/2019 7:52:32 AM
Metadata
Fields
Template:
Building Department
Company Name
GRAND HORIZONS
Building Department - Doc Type
Permit
Permit #
18-19548
Building Department - Name
JONES,DARLENE & FREDERICK
Address
37545 LORENA AVE
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E-Mount Installation Instructions <br /> Installation Tools Required:tape measure,roofing bar,chalk line,stud finder,caulking gun,sealant compatible with roofing materials, <br /> drill with 7/32"long-style bit,drill or impact gun with 1/2"deep socket. <br /> oil <br /> l course <br /> 0",211d course 3 <br /> f <br /> j6 <br /> Istcourse <br /> Locate,choose,and mark centers of rafters to be Carefully liftcomposition roof shingle with roofing Insert flashing between 1st and 2nd course.Slide <br /> mounted. Select the courses of shingles where bar,just above placement of mount.Remove nails up so top edge of flashing is at least 3/4"higher <br /> mounts will be placed. as required.See "Proper Flashing Placement"on than the butt-edge of the 3rd course and lower <br /> next page. flashing edge is above the butt-edge of 1 st course. <br /> Mark center for drilling. <br /> :u:rs7e4 <br /> �! d <br /> 1 <br /> Using drill with 7/32"bit,drill pilot hole into roof Clean off any sawdust,and fill hole with sealant Slide flashing into position. Prepare hanger bolt <br /> and rafter,taking care to drill square to the roof. compatible with roofing materials. with hex nut and sealing washer. Insert into hole <br /> Do not use mount as a drill guide.Drill should be and drive hanger bolt until QBlock stops rotating <br /> 'long style bit,aka'aircraft extension bit'to drill a easily.Do NOT over torque. <br /> 3"deep hole into rafter. <br /> moduleYou are now ready for the rack of your <br /> choice. Follow all the directions of <br /> the rack manufacturer as well as the <br /> instructions must also be followed <br /> by anyone <br /> K <br /> l ) <br /> m9difyin <br /> 9 a roof <br /> roof.Consult the:roof;manufacturer s specs <br /> and instructions prior to touching <br /> the <br /> Insert EPDM rubber washer over hanger bolt into Using the rack kit hardware, secure the racking <br /> block. (L-foot) to the mount using torque specs from <br /> racking manufacturer.If racking manufacturer does <br /> not specify torque setting,tighten to 13 ft:lbs. <br /> BI 7.2.3-26 May-2017 Rev 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.