Laserfiche WebLink
SMA S135.0-US Inverter with Hyundai HIS-S290RG Modules <br /> 5.8 kW DC Photovoltaic System Electrical Diagram with (2) Series Strings of 10 Modules <br /> 0 sG 7 s 9 <br /> Optional Supply Side Connection <br /> NEC 705.12A <br /> To 1,sae, sz90 #10 (10)Hyundai HiS-S290RG <br /> RG Modules in series <br /> Lt <br /> G N N M <br /> #6 bare copper <br /> GEC l3l#6 -Tdymefer SMA SB5.0-US Inverter <br /> TNHNRHWN-2 150A <br /> 3,4 WCc°nduh s290 #10 Hyundai HiSS290RG Max.Input DC Voltage: 600 <br /> 60 A fused RG <br /> dis°°^^eef with = Module Specifications VDC <br /> 30A fuses <br /> ¢ e9 Distribution Pmax:290 Wp Max ISC per string: 18 A <br /> Voc: 38.8 V MPPT Range: 100-550 VDC <br /> Vmpp: 32.0 V Max Output Voltage: 240 VAC <br /> 150A Panelboard with (4)#10 AWG PV Wire 2-R,2-B (1)#6 AWG Bare Copper Isc: 9.7 A Max Output current:24 A(AC) <br /> 150 A Main breaker(minimum) Impp: 9.1 A AC Nominal Power: 5000 <br /> O .C.Voltage: -0.30%/C Watts <br /> tso�2 <br /> ONotes: All work to meet or exceed NEC 2011 <br /> (4)#10 AWG THHN/THWN-2 OJunction box to be located within the array boundary. Junction box must be minimum Nema 3R UL listed <br /> 10 (Doi 2-B,2-R <br /> (1)#8 AWG THHN/THWN-2 enclosure.Free air conductors must be installed in raceway if readily accessible as per 690.31(A). <br /> Nema 3R 1-G 22 he minimum volume of the Nema 3R enclosure for the transition of PV wire to THWN-2 wire shall be <br /> 11 )30AI2 Junction 3/4 structure)"EMT,FMC 42 cubic inches. Heyco 5 wire Masthead gland seals or similar connector are required as strain relief <br /> ( <br /> Box LFNC,PVC(outside structure) for PV wire into Nema 311 junction box at array. <br /> i 690.31E IOInterconnection with 30 Amp 2 pole OCPD via 2011 NEC 705.12(D)(2)Load Side Connection. The 30 A <br /> i backfed breaker must be located at the opposite end of the bus from the 150 A main supply breaker <br /> 1� SMA Sunny Boy 5.0-US OThe required PV Backfed breaker plus the main breaker rating must be less than or equal to 120%of <br /> i Transformerless Inverter with <br /> existing �� the Main service bus rating. 705.12(D)(2) <br /> 9 n 9 Ae Optional Supply Side connection via 705.12A using parallel line taps in a NEMA 3R box(as required) <br /> integrated DC disconnect O <br /> grounding l,l i <br /> electrode (3)#10 AWG THHN/THWN-2 using NSI IPCS4002, Ilsco IPC-KUP-L or NSI Tork IPLD 3/0-3 Multi-Tap Connector or equivalent. <br /> i 1-B,1-R,1-W sOPV service disconnecting means for"optional"supply side connection must have neutral/EGC bond <br /> i (1)#8 AWG THHN/THWN-2 within and must be listed as"suitable for use as service equipment." 230.66 <br /> 1-G OThe fuses in the disconnect for the"supply side"option must be rated to handle the maximum short- <br /> } 3/4"EMT,FMC,LFNC, <br /> I or PVC circuit current available at the supply terminals.110.9,110.10 Over-current protection for the supply side <br /> G-- ------- connected conductors shall be located within 10 feet of the connection to the service. 705.31 <br /> OGrounded conductor shall be routed with ungrounded conductors to PV Service disconnecting means as <br /> (3)#10 AWG THHN/THWN-2 per 250.24(C)if"Supply Side"option is used. <br /> 1-B,1-R,1-W 0 <br /> (1)#8 AWG THHN/THWN-2 For"Supply Side option" Continuous or irreversibly spliced Grounding Electrode Conductor installed <br /> 1-G per 250.24(D). Grounding Electrode Conductor shall be specified as per 250.64 and sized per 250.66 <br /> 3/4"EMT,FMC,LFNC, to The following label is required on meter can and main panelboard"Services fed from dual power sources <br /> or PVC Utility and Photovoltaic system" <br /> If required by Utility 11 "PV input Do not relocate this OCPD"label required adjacent to backfed breaker. 705.12(d)(7) <br /> 30A 240V AC Disconnect with label: 13 <br /> 12 onding of module to rail and module to module accomplished through WEEB washers or self grounding <br /> On-site Utility Generation DC Disconnect Label Requirements q mid-clamps. <br /> Disconnect Switch Vmpp 320 VDC 13 "Warning:DC conductors of this system are ungrounded and may be energized"required on the <br /> PV AC Disconnect Label Requirements Vmax 417.1 VDC DC Disconnect 690.35F <br /> Operating Current: 24 A Impp 18.2 A 14."Warning:Photovoltaic Power Source"label required on conduit per 690.31(E)(3)(4) <br /> Operating Voltage:240 VAC Imax 24.25 A 15. Total voltage drop%for all circuits based on listed conductors is 1.770/ <br />