My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
18-19651
Zephyrhills
>
Building Department
>
Permits
>
2018
>
18-19651
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2019 9:44:21 AM
Creation date
2/7/2019 9:44:20 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
18-19651
Building Department - Name
MANDER JR, A R & FRANCES
Address
6536 STADIUM DR STE M
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C Q).PCC-S <br /> Construction, Inc. <br /> 1 8949 Gall Boulevard, Zephyrhills, FI 33541 <br /> PH: (813) 782-0920 & (352) 567-8580 Fax: (813) 715-4875 <br /> STATE CERTIFIED BUILDING AND ROOFING CONTRACTOR #CB-0059817 and #CC-0058134 <br /> SERVING FLORIDA'S FINEST HOMES & BUSINESSES SINCE 1976 <br /> www.schaperconstruction.com <br /> Date: April 18,2018 Phone: 813-727-4528 Fax: <br /> Name: Christine Carmona Contact: <br /> Address: 6536 Stadium Dr <br /> City Zephyrhills State F1 Zip 33542 <br /> We hereby propose to supply materials and labor as necessary to: <br /> Make necessary repairs to convert building to Beauty Shop : <br /> (According to drawings done by Rick Go hart) for A/C Bath & Plumbing <br /> • Permitting and Engineering(by owner) <br /> electric <br /> n Replace 100 AMP Sub Panel, 6 dedicated 20 Amp 120 volt circuits <br /> Zm 130 AMP 240 volt water heater circuit <br /> -< m 2 Replace exit lights <br /> m OT 1 Replace emergency lightV/ <br /> MN py 3 Repair fluorescent wrap lights C/7),� <br /> ...e 1 new 2 lamp fluorescent wrap fixture l� ?_1 <br /> m X m 1 GFCI receptacle at sink, Replace burnt feeder wire in sub panels <br /> _ Demo unsafe wiring, demo 100 AMP disconnect ��14 <br /> FRAME& SHEET ROCK <br /> C Post and 2 wall repairs (front west office area) <br /> 0° Side repair end wall and ceiling repair y Fq pRk <br /> Frame& Sheet rock at bath wall extension(electric box expansion) Coi�� 4 CO <br /> Frame&Materials <br /> Hang Finish and Texture(no Paint) 4 NO,q /Ty <br /> 0 m • DEMO ALL W RpS <br /> m 5 2"d Bath wall CpOFs R/tS�, <br /> oCut concrete slabs demo areas qN0 DiVq�F ?Ypt Y / <br /> m •� SLU1I�BING t outs at sink location ®R®�Nftci�®pig�®��"00® Re�A�t� <br /> Rough plumb material and Labor <br /> N Trim out material (fixtures not included) and labor. <br /> Gerber ADA toilet with seat(white) <br /> 2 Hot water lines to existing locations <br /> 7 Extend lines for 2 stations, supplies and drains in 2"d wash area false wall by others <br /> r <br /> i Fixtures supplied and installed by others <br /> Relocate 1 hand wash lavatory f <br /> • c-Plutnliing°.Co� � �z�^l <br /> -40 gal water heater and pan <br /> Carmona Beauty shop quote April 2018 Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.