Laserfiche WebLink
Q\TPJNITYIERD <br /> 6., INSTALLATION: <br /> 6.1 RhinoRoof Underlayments shall be installed in accordance with Interwrap, Inc. published installation <br /> instructions subject to the Limitations set forth in Section 5 herein and the specifics noted below. <br /> 6.2 Re-fasten any loose decking panels,and check for protruding nail heads. Sweep the substrate thoroughly to <br /> remove any dust and debris prior to application. <br /> 6,3 RhinoRoof U26: <br /> 6.3.1 Shall be installed in compliance with the requirements for ASTM D226, Type I or II underlayment in FBC <br /> Table 1507.1.1 for the type of prepared roof covering to be installed, taking into account the wider sheet- . <br /> width for double-layer applications. <br /> 6.3.1 Fasteners: <br /> For exposure<24 hours,corrosion resistant fasteners may be 1-inch roofing nails with a 3/8-inch diameter <br /> head,or those noted in 6.4.2. The use of staples is prohibited. <br /> For exposure > 24 hours up to maximum 30 days, corrosion resistant fasteners shall be minimum 1-inch <br /> diameter plastic or metal cap nails or FBC HVHZ nails&1-5/8"diameter tin caps(with the rough edge facing <br /> up). The use of staples is prohibited. <br /> 6.3.2 Single Laver;Roof Slope>4:12: <br /> End(vertical)laps shall be minimum 6-inches and side(horizontal)laps shall be minimum 4-inches. Refer to <br /> Interwrap, Inc. recommendations for alternate lap configurations and/or the use of sealant under certain <br /> conditions. <br /> For exposure < 24 hours, use of every-other fastening location printed on the surface is acceptable. For <br /> exposure > 24 hours up to maximum 30-days, use of every fastening location printed on the surface is <br /> required. <br /> When batten systems are to be installed atop the underlayment, the underlayment need only be <br /> preliminarily attached pending attachment of the battens on the samb day. Battens shall not be positioned <br /> over cap nails. If this occurs, remove the cap nail and patch the hole in accordance with Interwrap <br /> published instructions. <br /> 6.4.3 Double Layer;2:12<Roof Slope<4:12: <br /> End (vertical)laps shall be minimum 12-inches and side(horizontal)laps shall be`minimum half-sheet-width <br /> plus 1-inch. <br /> Double layer application; begin by fastening a half-width plus 1-inch starter strip along the eaves. Place a <br /> full-width sheet over the starter, completely overlapping the starter course. Continue as noted in 6.5, but <br /> maintaining minimum half-width plus 1-inch side(horizontal)laps,resulting in a double-layer application. <br /> 7. BUILDING PERMIT REQUIREMENTS: <br /> As required by the Building Official or Authority Having Jurisdiction in order to properly evaluate the installation of <br /> this product. <br /> 8. MANUFACTURING PLANTS: <br /> Qingdao,China <br /> 9. QUALITY ASSURANCE ENTITY: <br /> Intertek Testing Services NA Inc.—QUA1673; (608)836-4400 <br /> -END OF EVALUATION REPORT- <br /> Exterior Research and Design,U.C. Evaluation Report 140510.02.12-113 <br /> Certificate of Authorization#9503 6T"EDITION(2017)FBC NON-HVHZ EVALUATION F1.15216-113 <br /> Rhinoltoof Underlayments Revision 3:10/10/2017 <br /> Page 3 of 3 <br />