Laserfiche WebLink
Building Anal Job: 2889A1sf ADS Carrier <br /> g Y$IS Date: 5/1/2018 <br /> upper floor By: Dave <br /> BAYONET PLUMBING COOLING HEATING <br /> Project Information <br /> For: Lennar Homes <br /> Design Conditions <br /> Location: Indoor: Heating Cooling <br /> Tampa International AP, FL, US Indoor temperature(°F) 70 75 <br /> Elevation: 10 ft Design TD (OF) 39 17 <br /> Latitude: 280N Relative humidity (%) 50 50 <br /> Outdoor: Heating Cooling Moisture difference(gr/lb) 34.7 53.6 <br /> Dry bulb(OF) 31 92 Infiltration: <br /> Daily range(°F) - 14 ( L ) Method Simplified <br /> Wet bulb(OF) - 77 Construction quality Semi-tight <br /> Wind speed (mph) 15.0 7.5 Fireplaces 0 <br /> Component Btuh/ft2 Btuh % of load <br /> Walls 3.8 3623 33.1 acts <br /> Glazing 30.2 2386 21.8 <br /> Doors 0 0 0 wan <br /> Ceilings 1.3 1384 12.6 nfilt<ati°n <br /> Floors 2.0 30 0.3 <br /> Infiltration 2.1 2121 19.4 <br /> Ducts 1402 12.8 <br /> Piping 0 0 Other <br /> Humidification 0 0 Ceilings <br /> Ventilation 0 0 Glazing <br /> Adjustments 0 <br /> Total 10946 100.0 <br /> Component Btuh/ft2 Btuh % of load <br /> Walls 2.9 2718 20.2 <br /> Glazing 52.2 4127 30.7 Wall Internal Gains, <br /> Doors 0 0 0 <br /> Ceilings 1.7 1874 14.0 <br /> Floors 0.9 14 0.1 <br /> Infiltration 0.5 504 3.8 Ducts <br /> Ducts 1682 12.5 <br /> Ventilation 0 0 <br /> Internal gains 2510 18.7 infiltration <br /> Blower 0 0 Glazing Other <br /> Adjustments 0 Ceilings <br /> Total 13429 100.0 <br /> Latent Cooling Load=2649 Btuh <br /> Overall U-value= 0.088 Btuh/ft2-°F <br /> Data entries checked. <br /> - wrightsoftt� 2018-May-01 13:32:55 <br /> Right-Suite®Universal 2018 18.0.16 RSU05714 Page 2 <br /> ..ent\288SA1 sf ADS template 1.5-2ton Carrier.rup Calc=MJ8 Front Door faces:NW <br />