Laserfiche WebLink
E-Mount Installation Instructions <br /> Installation Tools Required:tape measure,roofing bar,chalk line,stud finder,caulking gun,sealant compatible with roofing materials, <br /> drill with 7/32"long-style bit,drill or impact gun with 1/2"deep socket. <br /> .., <br /> --�= <br /> :.A,.. ' <br /> �V�`�'✓9.`.' ,'� III <br /> Locate,choose,and mark centers of rafters to be Carefully lift composition roof shingle with roofing Insert flashing between 1st and 2nd course.Slide <br /> mounted. Select the courses of shingles where bar,just above placement of mount.Remove nails up so top edge of flashing is at least 3/4" higher <br /> mounts will be placed. as required. See "Proper Flashing Placement" on than the butt-edge of the 3rd course and lower <br /> next page. flashing edge is above the butt-edge of 1 st course. <br /> Mark center for drilling. <br /> NN T A <br /> •v: <br /> Using drill with 7/32"bit,drill pilot hole into roof Clean off any sawdust,and fill hole with sealant Slide flashing into position. Prepare hanger bolt <br /> and rafter,taking care to drill square to the roof compatible with roofing materials. with hex nut and sealing washer. Insert into hole <br /> Do not use mount as a drill guide.Drill should be and drive hanger bolt until QBIock stops rotating <br /> 'long style bit,aka'aircraft extension bit'to drill a easily.Do NOT over torque. <br /> 3"deep hole into rafter. <br /> >' I I�ilLl 1,• r - .. . .:-V. <br /> v ; *'`,L �i•tea 1, F <br /> Insert EPDM rubber washer over hanger bolt into Using the rack kit hardware, secure the racking <br /> block. (L-foot) to the mount using torque specs from <br /> racking manufacturer.If racking manufacturer does <br /> not specifytorque setting,tighten to 13 ft.-Ibs. <br /> BI 7.2.3-26 May-2017 Rev 6 <br />